background image

10

Installation

1.  Remove the convection baffl e from the appliance. 

It is held in place by screws located right behind 
the upper edge of the fi replace opening (3 screws). 
Recycle this panel as it is no longer needed.

2.  Remove the four cover plates on top of the 

appliance case (6 screws each).

3.  Install the collars on the holes where the cover 

plates were (6 screws each).

4.  Frame a rough opening at the desired location—see 

earlier sections of this manual for allowable plenum 
positions and rough frame opening sizes.

WARNING

All FOUR (4) takeoffs MUST BE 
CONNECTED TO PLENUM(S).

WARNING

DO NOT INSTALL 1270RBK Remote 
Blower Kit to any of these 4 takeoffs.

!

!

Remove convection baffl e

Appliance front panel—shown transparent for clarity

Convection baf

fl e

Convection 
baffl e to be 
removed

Convective 
airfl ow with 
baffl e 

removed

Take-off 
collar

Firebox

Section view through baffl e

Convective 
airfl ow with 
baffl e 

in place

Summary of Contents for HeatShift LDK1

Page 1: ...atible with the J series Linear fireplaces only Earlier version fireplaces will not accept the addition of this kit Note These instructions are to be used in conjunction with instructions supplied with the fireplace Note the fireplace requires the removal of the internal convection baffle for this system to function properly read instructions carefully The use of this kit will permit lower mantel ...

Page 2: ...x 2 LDK3 2 14 x 6 LDK6 2 10 x 5 LDK5 supplied separately 38 frame 2 14 x 6 grilles included 4 take off collars included 4 take off collars included 4 take off collars included LDK2 supplied separately 48 frame Kits Contents ...

Page 3: ...nt may conflict with plenum Offset vent around plenum Corner installation with front or rear wall outlet using LDK1 LDK3 or LDK4 Side wall outlets using LDK3 Rear wall outlets using LDK3 WARNING This duct kit is approved for horizontal discharge ONLY DO NOT install ple num in floor or ceiling DO NOT DISCHARGE OUTDOORS ...

Page 4: ...tibles around pipes Min 1 clearance to combustibles around pipe Support horizontal sections of pipe using strapping every 24 DO NOT RUN pipe horizontal Minimum slope 4 12 Min bend radius 8 5 5 4 12 Vertical Rise Y Min 30 Max 12 0 Maximum allowable Horizontal Offset X offset for take off that s furthest away Ceiling LDK 1 LDK 3 or LDK 4 Min bend radius Top of fireplace Y Vertical Rise X Max Allowab...

Page 5: ...ounting bracket and 1 1 2 standoff mounting bracket and 1 2 standoff 8 11 1 2 1 2 wallboard 1 2 standoffs 1 2 standoff 38 LDK 4 5 dia collars 4 C L 10 LDK 4 10 LDK 4 10 LDK 4 3 1 2 standoff 1 2 standoff 2 8 1 2 standoffs 6 knock out each end for optional 1270RBK connection 11 1 2 8 4 1 2 wallboard mounting bracket and 1 1 2 standoff mounting bracket and 1 2 standoff Min 1 below finished ceiling LD...

Page 6: ...learance to combustibles top Ceiling Min 2 1 2 clearance to ceiling 2 x 4 on edge 2 x 4 on edge Framing on edge 1 2 1 2 min clearance to combustibles rear sides 1 min clearance to combustibles all around pipes 2 x 4 on edge to support plenum Maintain 1 clearance to pipes Framing on edge 1 1 2 min clearance to combustibles top Ceiling Min 2 1 2 clearance to ceiling 1 2 1 2 min clearance to combusti...

Page 7: ...e to pipes LDK 1 LDK 4 ONLY see clearances on page 6 Space between mounting brackets may be left open to allow cavity to ventilate Discharge cavity requires a base the entire length of the plenum outlet as a minimum otherwise beyond that it may be left open to allow cavity to ventilate and mix with discharge air Note Staining or streaking may occur on light colored ceilings due to any dust etc in ...

Page 8: ...off supplied with 1270RBK kit Can mount to either end of plenum Maximum 1 x 1270RBK kit per plenum Note DO NOT CONNECT 1270RBK directly to fireplace when using LDK Duct Kit connect to LDK plenum ONLY as this will ensure cooler wall temperature whether or not the 1270 fan is running 1270RBK fan unit see diagram for possible mounting positions May be positioned higher or lower than LDK plenum positi...

Page 9: ...stible hearth Combustible materials must be kept behind this line 23 3 4 29 3 4 33 3 4 45 NOTE These Mantel Clearances apply ONLY when LDK Duct system is installed Mantel Height from Bottom of Unit Max 6 non combustible projection allowed top and bottom at edge of 1 trim Only allowed when using LDK Duct kit 1 Trim Screws penetrating through cement board into this area to fasten support mantels and...

Page 10: ...6 screws each 4 Frame a rough opening at the desired location see earlier sections of this manual for allowable plenum positions and rough frame opening sizes WARNING All FOUR 4 takeoffs MUST BE CONNECTED TO PLENUM S WARNING DO NOT INSTALL 1270RBK Remote Blower Kit to any of these 4 takeoffs Remove convection baffle Appliance front panel shown transparent for clarity Convection baffle Convection b...

Page 11: ... of the pipe sections to the plenum securing them with the gear clamps provided An upward slope must be maintained in horizontal sections of pipes for proper convection Use straps as necessary to maintain the pipes positions Support horizontal sections every 24 inches 9 Paint the inside surfaces of the plenum using high temperature flat black spray paint for installations where the inside of the p...

Page 12: ...566 LDK2 48 Outlet Frame Kit for LDK1 Aux Frame SPL 48 x 2 white 4005612 LDK3 14 Double Hot Air Plenums Kit 14 x 6 double plenums 2 4005464 5 take off collars 4 4005478 DABL 00 C SPL 14 x 6 Grilles white 2 4005614 Top mounting bracket standoffs 2 4005566 LDK4 38 Quad Hot Air Plenum Kit 38 x 2 quad plenum 4005477 5 take off collars 4 4005478 Top mounting bracket standoffs 2 4005566 LDK5 38 Outlet F...

Page 13: ...LDK4 sont homologués par l ASN CSA pour utilisation avec les foyers Valor de la Série Linear indiqués ci dessus NE PAS les utiliser avec d autres modèles Un conduit de 5 pouces de diamètre non inclus utilisé avec ces kits doit être fabriqué de métal et doit répondre aux normes UL 181 Class 1 Air Duct Les conduits souples d aluminium sont acceptables s ils répondent aux normes UL 181 Class 1 Kits 3...

Page 14: ...endu séparément Cadre de 38 2 grilles de 14 x 6 incluses 4 buses incluses 4 buses incluses 4 buses incluses LDK2 vendu séparément Cadre de 48 Contenu des kits LDK1 48 x 2 LDK4 38 x 2 LDK3 2 14 x 6 LDK6 2 10 x 5 ...

Page 15: ...le conduit d évacuation autour du plénum Installation en coin avec sortie avant ou sur un mur arrière avec LDK1 LDK3 ou LDK4 Sorties sur les côtés avec LDK3 Sorties sur un mur arrière avec LDK3 AVERTISSEMENT Ce système de canalisation est homo logué pour débit à sortie horizontale SEULEMENT NE PAS installer le plé num au plancher ou au plafond NE PAS ORIENTER LE PLÉNUM VERS L EXTÉRIEUR ...

Page 16: ...nduits min 1 25 mm Supportez les sections horizontales de conduits aux 24 610 mm avec courroies PAS DE PARCOURS horizontal de conduits Pente minimale 4 12 Rayon de courbe min 5 127 mm Rayon de courbe min 5 127 mm 8 4 12 Élévation verticale Y Min 30 762 mm Max 12 0 3 7 m Décalage horizontale maximum permis X décalage pour buse la plus loin Plafond LDK 1 LDK 3 ou LDK 4 Dessus du foyer Y Élévation ve...

Page 17: ...if 11 1 2 292 mm 11 1 2 292 mm 11 1 2 292 mm panneau gypse 1 2 13 mm panneau gypse 1 2 13 mm panneau gypse 1 2 13 mm support et écarteur 1 1 2 38 mm support et écarteur 1 1 2 38 mm support et écarteur 1 1 2 38 mm support et écarteur 1 2 13 mm support et écarteur 1 2 13 mm 3 76 mm 2 51 mm 3 76 mm 3 76 mm Écarteur 1 2 13 mm Écarteur 1 2 13 mm support et écarteur 1 2 13 mm Écarteur 1 2 13 mm 38 965 m...

Page 18: ...strement à plat Dégagement min de 1 1 2 38 mm des combustibles au dessus Plafond Plafond Dégagement min de 2 1 2 64 mm du plafond Dégagement min de 2 1 2 64 mm du plafond 1 2 13 mm Dégagements min de 1 2 13 mm des combustibles sur les côtés et à l arrière Dégagement min de 1 1 2 38 mm des combustibles au dessus 1 2 13 mm Dégagements min de 1 2 13 mm des combustibles sur les côtés et à l arrière Dé...

Page 19: ...page 18 Espace entre les supports de montage peut demeurer ouvert pour permettre la ventilation de la cavité La base de la cavité de sortie d air chaud doit être d au moins la même largeur que la sortie du plénum le reste de l espace peut demeurer ouvert afin de permettre la ventilation de la cavité Note Des taches causées par la poussière dans le débit d air peuvent apparaître sur les plafonds de...

Page 20: ... Peut être raccordé à un ou l autre bout du plénum Maximum 1 x 1270RBK kit par plénum Note NE PAS RACCORDER LE 1270RBK directement au foyer si le Système de canalisation LDK est utilisé raccordez le au plénum LDK SEULEMENT afin de vous assurer que la température du mur soit plus froide même lorsque le ventilateur 1270 ne fonctionne pas Boîtier du ventilateur 1270RBK consultez le schéma pour l empl...

Page 21: ...tériaux combustibles doivent être gardés derrière cette ligne 23 3 4 603 mm 29 3 4 756 mm 33 3 4 857 mm 45 NOTE Ces dégagements ne s appliquent que lorsque le Système de canalisation LDK est installé Hauteur du Manteau à partir du bas de l appareil Saillie incombustible maximale de 6 152 mm permise au dessus et au dessous de la bordure de 1 Permis SEULEMENT lorsque le Système de canalisation LDK e...

Page 22: ...mmaire à l endroit désiré consultez les sections précédentes de ce guide afin de connaître les positions permises pour le plenum et les dimensions d encastrement AVERTISSEMENT Les QUATRE 4 buses DOIVENT ÊTRE RACCORDÉES AU X PLENUM S AVERTISSEMENT NE PAS INSTALLER le Ventilateur de zone 1270RBK aux quatre buses Enlevez le déflecteur de convection Paroi avant de l appareil transparente pour clarific...

Page 23: ... l autre bout des sections de conduits au plenum à l aide de colliers de serrage fournis Une pente vers le haut doit être maintenue s il y a des sections horizontales afin de favoriser une bonne convection Utilisez des courroies si nécessaire pour maintenir la position des conduits Supportez les sections horizontales à chaque 24 pouces 9 Vaporisez une peinture noire mate à haute température sur le...

Page 24: ...5477 Buses de 5 4 4005478 Supports de montage écarteurs 2 4005566 LDK5 Cadre de finition 38 pour LDK4 Aux Frame SPL 38 x 2 blanc 4005613 LDK6 Kit conduits aluminium 2 plis 5 Conduits souples d aluminium 5 dia 10 long étiré 2 4005635 Colliers de serrage 4 5 6 5 8 4005642 Liste de pièces LDK5 LDK6 Chaque kit LDK est vendu séparément Conçu e et fabriqué e par pour Miles Industries Ltd 190 2255 Dollar...

Reviews: