Valor 700MNGK Installation Manual Download Page 6

Designed and Manufactured by / for

Miles Industries Ltd.

190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA  V7H 3B1

Tel. 604-984-3496  Fax 604-984-0246

www.valor

fi

 replaces.com

Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.

Reassemble Fireplace

Reverse all the previous steps taken in the previous 

section, 

Prepare the Appliance

, on page 2.

Consult the appliance`s 

Installation Manual

 for full 

details of the above steps. 

Adjust the air shutter

Once the burner module reinstalled, the air shutter is at 

the left of the 

fi

 rebox. 

1.  Locate the aeration adjustment lever. 

2.  Adjust the aeration lever as required. Depending on 

fuel bed used, altitude and other considerations, the 

fl

 ame picture may be improved by adjusting the 

aeration. The need for adjustment should be 

determined only by operating the appliance with the 

fuel bed, liners and window installed and evaluating 

the 

fl

 ame picture after a 15-minute warm-up.

Airshutter open

Airshutter closed

Fit the Speci

fi

 cations Label

1.  Complete the required details of the new label:

“This appliance was converted on... by...”

 etc.

2.  Fit the conversion label with new speci

fi

 cations over 

the corresponding speci

fi

 cations on the data plate 

attached to the 

fi

 replace at right hand side between 

the 

fi

 rebox and the outer case of the appliance. 

3. Complete the 

fi

 replace installation.

6

Summary of Contents for 700MNGK

Page 1: ...els ONLY INSTALLATION MANUAL G3 5 Series 4008354 03 2021 Miles Industries Ltd Kit Contents 1 Pilot injector 1 Main burner injector elbow 1 Air shutter 1 Pilot shield 1 Minimum rate bypass screw 1 Set of conversion labels Tools Required Wrenches to disconnect gas line Phillips screwdriver to remove burner module Small jewelers size flat blade screwdriver to set pressure Small flat blade screwdriver...

Page 2: ...lled trims fronts and doors 3 Remove the window 4 If the fireplace is already installed a Remove the fuel bed Be careful with fuel bed as components are fragile b Remove liner panels c Disconnect the exhaust slide screws 2 screws at top front of unit d Pull the unit out while disconnecting the exhaust slide Leave the vents and slider hanging in the chimney 5 Remove left shroud 2 screws 6 Remove th...

Page 3: ...2 Unscrew the nut at the end of the burner fuel supply line and lift the burner and supports out of the fireplace complete with injector elbow at tached 3 Unscrew and disengage the injector elbow Be aware that four pieces sit between the elbow and the burner do not drop them 4 Exchange injector elbow from kit verifying the new injector before you install see Specifications table on page 1 The inje...

Page 4: ...uld not be removed 3 Unscrew the pilot injector using an Allen key Dis card the old pilot injector 4 Replace with the appropriate pilot injector see Specifications table on page 1 the pilot injector number is stamped on the barrel Screw in the new injector Pilot hood U clip 5 Refit the pilot hood by pushing down on it mat ing its notch and key at the base Ensure that it snaps into position 6 Insta...

Page 5: ...nnection joints that were taken apart and reassembled Bubbles forming indicate a gas leak Bypass screw Valve WARNING NEVER use an open flame to check for leaks Correct any leak detected immediately Set the Manifold Pressure 1 Fit a manometer to the manifold pressure test tap on the valve see figure below 2 Light the appliance and turn the control to full input 3 Adjust the pressure adjustment scre...

Page 6: ...he firebox 1 Locate the aeration adjustment lever 2 Adjust the aeration lever as required Depending on fuel bed used altitude and other considerations the flame picture may be improved by adjusting the aeration The need for adjustment should be determined only by operating the appliance with the fuel bed liners and window installed and evaluating the flame picture after a 15 minute warm up Airshut...

Page 7: ...N Série G3 5 Contenu du kit 1 Injecteur de veilleuse 1 Injecteur coude du brûleur 1 Obturateur d air 1 Écran de veilleuse 1 Vis d indice minimum 1 Ensemble d étiquettes de conversion Outils requis Clés à tuyaux pour débrancher la conduite de gaz Tournevis Phillips pour enlever le module du brûleur Petit tournevis à lame de bijoutier pour régler la pression Petit tournevis à lame pour libérer la pr...

Page 8: ...oyer est déjà installé a Enlevez le lit de combustion Faites attention car les pièces sont fragiles b Enlevez les panneaux intérieurs c Détachez l appareil de sa plaque d évent 2 vis au dessus de la caisse de l appareil d Tirez l appareil hors de la cavité en enlevant la plaque d évent Elle demeure raccordée aux conduits dans la cheminée 5 Enlevez le support de devanture bordure gauche 2 vis 6 Enl...

Page 9: ... vis 2 En soutenant l injecteur coude dévissez l écrou retenant la conduite de gaz pour la débrancher Sortez le rail du brûleur de la boîte de foyer avec l injecteur coude toujours en place 3 Dévissez et enlevez l injecteur coude du brûleur en faisant attention de ne pas échapper les qua tre petites pièces situées entre l injecteur et le brûleur 4 Remplacez l injecteur par celui fourni avec la tro...

Page 10: ...lleuse pour l enlever 3 Enlevez l injecteur de la veilleuse avec une clé Allen et jetez le 4 Remplacez le avec l injecteur approprié voir le tableau Spécifications à la page 7 Installez le nouvel injecteur et serrez le Capuchon Attache en U 5 Réinstallez le capuchon de la veilleuse alignant la fente du capuchon à la clé dans sa base et en pous sant dessus Assurez vous qu il s enclenche correcte me...

Page 11: ...JAMAIS UTILISER une flamme vive pour vérifier s il y a des fuites Corrigez immédiatement toute fuite détectée Réglez et vérifiez la pression d admission 1 Fixez un manomètre à la connexion de vérification de pression d admission sur la soupape voir l image ci dessous 2 Allumez l appareil et tournez le contrôle pour apport maximal 3 Réglez la vis d ajustement de pression sur la soup ape à l aide d ...

Page 12: ...aération La nécessité de changer l aération devrait être détermi née seulement après avoir fait fonctionner l appareil avec le lit d alimentation les panneaux et la fenêtre installés et après avoir évalué les flammes suivant un réchauffement de 15 minutes Obturateur ouvert Obturateur fermé Conçue et fabriquée par pour Miles Industries Ltd 190 2255 Dollarton Highway North Vancouver BC CANADA V7H 3B1...

Reviews: