Page 8
Chapter II Transportation and Installation
2-1 Case handling
Use forklift truck with carrying capacity of more than 1 ton to carry wooden case.
2-2 Packing and unpacking
Packing
Before packing, fix the four wheels of the machine first and put the machine on mat to prevent sliding.
Unpacking
Carry out the steps of packing in reverse order.
2-3 Working conditions
Temperature: 20~28
℃
Humidity: 45~55%
2-4 Machine handling
The machine shall be carried by two persons. One is pushing at the back of the machine and the other is in front
of it to control the moving direction.
2-5 Space requirements
Length: 2.5m Width: 3 m Height: 2.5 m
2-6 Electrical specifications
1 The voltage for this machine is single-phase 220V, 50/60Hz
2-4 Installation steps
1. Put the machine one a flat ground.
2. Use a pallet jack to lift the machine and put it one four feet.
3. Use a level gauge to measure the top of the four feet to make sure the machine is placed horizontally.
4. Connect the gas pump pipe to the right side of the machine. Note: Diameter of gas pump pipe is
8mm
5. There are two cooling pipes behind the machine, one is connected to the gas pump and the other is
for gas outlet. Please adjust the pressure regulating valve to control air flow. (Note: In case of water
cooling, insert one cooling pipe in the water inlet of the water cooler and inset the other pipe in the
water outlet)
6. Connect power cable
2-5 Disassembly steps
The steps of installation in reverse order.