website:
www.valleyacrylic.com
• E-mail:
• customer service call Toll Free:
1.877.398.8827
• Fax:
+1.604.820.0124
889001
SHOWER PANEL
I N S T A L L A T I O N G U I D E
4
01
02
03
04
A
B
First carve a rectangular slot:
7.67” (w) x 64.9” (h) x 3.5” (d)
, in the wall
that is
17.71”/450mm
high from the ground and two inlet water pipelines
(the overall height shall not be greater than 82.67” / 2100mm)
Connect the embedded hot and cold water supply hoses with the
concealed box and place it into the slot created in the wall. Fix the
concealing box in place with screws; making sure there is no slipping or
loosening.
(Attention: The Filter washer must be installed to avoid dirt clogging)
WALL
WALL
WALL
FLOOR
Paste the wall tiles according to the picture
Drain the dirty water from the hot and cold water inlet hoses, then
connect them to the concealing box. Mount the front shower panel to
the concealing box as shown.
A
MUST BE FULLY CLICKED
INTO THE
B
SLOT
7.67” / 195mm
64.9” / 1650mm
17.71” / 450mm
HOT WATER
CONNECTOR
COLD WATER
CONNECTOR
3.5” / 90mm
82.67” / 2100mm
HOT WATER
CONNECTOR
HOT WATER
CONNECTOR
COLD WATER
CONNECTOR
COLD WATER
CONNECTOR
7.28” / 185mm
64.17” / 1630mm
18” / 458mm