![Valley-Dynamo Dynamo Fire Storm Hockey Assembly Instructions Manual Download Page 10](http://html1.mh-extra.com/html/valley-dynamo/dynamo-fire-storm-hockey/dynamo-fire-storm-hockey_assembly-instructions-manual_851211010.webp)
9
Step 9 : Notice how the rectangular opening and
four bolt holes on the side of the table match the
rectangular opening and four bolt holes found in
the Side Mounting Bracket. Always install this
bracket large holes UP, small holes DOWN
Step 14:
On FRONT side wall above the service
door. Don’t fully
tighten the bolts yet.
Step 12: On REAR side wall, feed the wire harness
through the bracket opening.
8.
On the Front Side
wall of the table
(containing the long
door secured with
two locks) remove
the four screws and
washers found at the
center of the table.
9.
Secure a Side
Mounting Bracket using the screws and washers removed in the prior step. This part
is tapered to follow the angled side on the table
and should be installed with the LARGE holes
UP, and the two SMALL holes facing DOWN.
Make sure this bracket is parallel to the top rail
or your overhead will be crooked.
10.
Slide a Side Mounting Bracket Cover in
place. For now, secure the bracket with one
screw and washer in each corner. Thread just
enough to hold the cover loosely to the bracket.
11.
On the Rear Side Wall of the table (no service
door, wire harness for overhead is secured) cut the wire tie
holding the harness in place. Remove the 4 screws and
washers as on the Front Side Wall.
12.
Feed the wire harness through the opening on the Side
Mounting Bracket and secure using the four screws and
washers from the previous step.
13.
Have at least two people bring the assembled overhead
to the table. Orient the side with the wire harness toward
the Rear Side Wall.
14.
Slide the overhead tubes into the Front Side
Wall Side Mounting Bracket and tighten the four
corner screws on the Mounting Bracket Cover
enough to stabilize and hold the overhead. You
will fully tighten this bracket in a later step.