Installation manual 

 

 
 

 

 

Having installed the roof boards, the roof felt and roof 
slats must be attached.  

The table of components shows whether the roof 
cover material and slats are included with this 
house option! 

First of all, screw the roof edge reinforcements and eave 
edgings under the roof board ends. Then install the roof 
cover material. 

 

 

 

Installation of roof slats: 

Roof cover material (NB! Some house options do not include it in the kit!) 

Cut the roof felt in accordance with the roof length into suitable pieces and begin installing them 
parallel to the lower edge of the roof, moving toward the crest and placing the felt strips in the direction 
from the back wall to the front wall. The felt should extend from the edge by approximately 2-4 cm. 
Attach the roof felt to the roof boards with the supplied felt nails at intervals of about 15 cm. Make sure 
that the felt strips overlap by at least 10 cm.  

 

 

 

Having installed the roof cover material, attach the 
wind braces to the roof and the facia boards to the 
rafters and upper wall logs.  

 

Installation of wind braces and facia boards: 

 

Floor 

Only when the house is built completely you can install the floor boards, thus avoiding unnecessary 
smudging on the floor. 

Place the floor boards on the base frame, tap them lightly against one another and then nail them with 
force to the foundation joists. If necessary, cut the last floor board to the suitable width.  

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

ATTENTION

: Depending on the climate at the house location, the floor boards can either swell or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 

Summary of Contents for WISCONSIN 2

Page 1: ...l prodotto Reservado el derecho a modificaciones t cnicas Produsent forbeholder seg retten til endre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden V robce si vy...

Page 2: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 3: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 4: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 5: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 6: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Page 7: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 8: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 9: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Reviews: