Wind turbine power generation has a cubic relationship with the inlet wind speed. This means if 
the wind speed is doubled, the produced power increases by a factor of 8. The power curve of the 
Hyland 920 is presented below. The Hyland 920 wind turbine system includes a Diffuse Energy 
maximum power point tracking (MPPT) controller that optimises the amount of power extracted for 
a given wind speed. For wind speeds beyond 18 m/s (65 kmh) the controller is designed to reduce 
the rotor speed to limit the power output to 1 kW and prevent the damage of electrical systems.

Power curve

Also note that when the battery is in a high state of charge the boost circuit of the turbine controller 
is limited to 10A. The full current applies when the turbine voltage reaches the battery voltage

The following section outlines the installation procedure for the Hyland 920 wind turbine.

Telecommunications tower installation

1.  Unpack turbine and check that all components are present. Note that the turbine is 

preassembled and checked prior to delivery.

2.  Feed the system 3 core power cable (recommend 12 AWG) through the mounting pole. The 

turbine is designed to be mounted on a length of

 40 NB (48.3 mm OD) Galvanised Pipe.

3.  Attach the Hyland 920 power cable to the system power cable.
4.  Insert the yaw mechanism base onto the mounting pole, ensuring that it is fully inserted.
5.  Tighten the hose clamp on the base to approximately 4 Nm.
6.  Loop a cable tie around the vertical diffuser support and one of the blades. This will prevent the 

blades from spinning during installation.

7.  Install lifting lug to either top support thread or two side support threads. See image below.
8.  Hoist turbine up tower using site preferred method.

System installation

6

AUS

 

[email protected]    NZ  [email protected]

Summary of Contents for Hyland 920

Page 1: ...AUSTRALIA 1300 734 253 sales valen com au www valen com au NEW ZEALAND 0800 734 253 sales valen co nz www valen co nz VALEN 920 WIND TURBINE OWNERS MANUAL VERSION 1 AUGUST 2021 ...

Page 2: ...aulty operation please refer to the Trouble Shooting section of this User Manual or contact us at sales valen com au Note please refer to the attached Hyland 920 Controller User Manual for instructions relating to the controller How to use this manual The components received from Valen are shown in the table below Check you recieved Component Quantity Hyland 920 Wind Turbine 1 Diffuse Energy MPPT ...

Page 3: ...hat turbine must be placed out of reach of personnel This means at least 2 7m above any platform below the turbine In the event that work is to be carried out closer to the turbine then it must be isolated by applying the short and work cannot commence above 40 km h wind speeds Mechanical dangers A breaker should always be installed between the battery and controller to allow electrical isolation ...

Page 4: ...al specifications and turbine dimensions are shown below Diffuse Energy realise that each application is unique and customers may require additional information We welcome the opportunity to supply additional technical information Technical specifications Physical dimensions 920 x 920 x 373 mm Mass 18 5kg Rated power output 220W Rated wind speed 11m s 40km h Peak Current to Battery 20A limited by ...

Page 5: ...ystem Passively aligns to the wind direction Rotor configuration 6 bladed horizontal axis downwind CO2 savings 1 000 kg yr above 5 m s 1 Rayleigh distribution assumed as per IEC61400 2 Section 3 60 2 Annual power generation based on Bureau of Meteorology wind speed records of 18 Australian airport sites Predicting the power output of wind turbines at a particular site can be difficult Diffuse Ener...

Page 6: ...following section outlines the installation procedure for the Hyland 920 wind turbine Telecommunications tower installation 1 Unpack turbine and check that all components are present Note that the turbine is preassembled and checked prior to delivery 2 Feed the system 3 core power cable recommend 12 AWG through the mounting pole The turbine is designed to be mounted on a length of 40 NB 48 3 mm OD...

Page 7: ...e two phases of the output to the battery through a breaker switch Set the breaker to off 13 On the turbine controller set the SHORT RUN switch to SHORT See image below 14 Remove the cable tie from the Turbine 15 Turn the battery breaker to on 16 On the turbine controller set the SHORT RUN switch to RUN 17 Assuming there is wind the MPPT controller will now power up Note The controller will not be...

Page 8: ...ine from the pole if necessary and allow turbine to yaw freely 7 Run cabling to the controller and connect the three phases of the turbine power to the controller 8 Connect the two phases of the output to the battery through a breaker switch Set the breaker to off 9 On the turbine controller set the SHORT RUN switch to SHORT See image below 10 Remove the cable tie from the Turbine 11 Turn the batt...

Page 9: ... as per manufacturer s instructions Turbine Plumbed vertical ELECTRICAL SYSTEM 20A breaker installed between controller and power system 10 AWG wires installed between controller and power system battery HYLAND 920 Yaw clamp tightened to 4 Nm Turbine is tracking wind tower vertical 9 INDUSTRIAL BATTERY ENERGY STORAGE SOLUTION PROVIDER AUS 1300 734 253 NZ 0800 734 253 ...

Page 10: ...ts are expected For remote area operation we can supply an automated system that will protect the controller For details contact us NB By March 2021 the high wind protection will be integral to the controller it will cause the turbine to shut down at 75km h High wind conditions There are no maintainable components on the Hyland 920 wind turbine Diffuse Energy recommends a visual inspection after s...

Page 11: ...itches to RUN Damaged blades Check blades for visual damage If blades are damaged contact sales valen com au Stiff generator bearing Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE and SHORT positions respectively Try to rotate turbine shaft If shaft is stiff contact sales valen com au Stiff yaw bearing Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE a...

Page 12: ...cuit Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE and SHORT positions respectively Contract qualified electrician to check electrical circuit Repair by authorised personnel Turbine spins in windy conditions but makes no power Check continuity between phases at controller plug Check battery state of charge Check charge light on controller if red there is a fault If there i...

Page 13: ...al connections by authorised personnel High electric cable resistance Check cable cross section and lengths with recommended dimensions in Wiring Specifications Replace with higher cross section cable Damaged blades Check blades for visual damage If blades are damaged contact sales valen com au If you require further assistance please contact us using the details on the back page Further Support 1...

Page 14: ... SAFETY CERTIFIED ISO 45001 2018 OBSEQUENTIA QUALITY CERTIFIED IS0 9001 2015 OBSEQUENTIA ENVIRONMENT CERTIFIED ISO 14001 2015 Company Details Legal Entity Valen Power Pty Ltd ACN 134 028 961 Telephone 1300 734 253 ...

Reviews: