Page 43
Installation and Operation Manual - FP10 Lafayette II
ENGLISH
• The
chimney
must have
at least one support
. The maximum chimney length that should
be supported by the fireplace is 9 feet (2.75 m) for 2" Solid Pack chimney (5 cm) and 12 feet
(3.7 m) for 1" Solid Pack chimney.
• The chimney must extend at least 3 ft. (92 cm) above its point of contact with the roof and at
least 2 ft. (61 cm) higher than any wall, roof or building within 10 ft. (3.1 m) of it.
•
WARNING : IF THE CHIMNEY IS INSTALLED IN A CHASE, IT MUST EXCEED THE TOP
OF IT BY AT LEAST 3 FEET (92 CM) IF IT’S MADE OF COMBUSTIBLE MATERIALS OR
AT LEAST 1.5 FEET (46 CM) WHEN IT IS MADE OF NON-COMBUSTIBLE MATERIALS.
• Avoid deviations as much as possible, especially the sharp ones. Each deviation adds
restriction to the system and can lead to draft problems.
• If the chimney extends higher than 5 ft. (1.5 m) above its point of contact with the roof, it must
be secured using a roof brace.
• A rain cap must be installed on top of the chimney.
• Cut and frame square holes in all floors, ceilings, and roof that the chimney will go through to
provide a 2" (50 mm) minimum clearance between the chimney and any combustible materials.
Do not fill this 2" space with insulation or any other combustible material.
2' (0.61 M)
MINIMUM
LESS THAN 10' (3.1 M)
CHIMNEY: 3' (0.92 M)
MINIMUM
2' (0.61 M)
MINIMUM
10' (3.1 M)
MORE THAN 10' (3.1 M)
CHIMNEY: 3' (0.92 M)
MINIMUM
NOTE: HEIGHT ABOVE ANY
ROOF SURFACE WITHIN
10' (3.1 M) HORIZONTALLY
CHIMNEY
CHIMNEY
RIDGE
CHIMNEY: 3' (0.92 M)
MINIMUM
2' (0.61 M)
MINIMUM
2' (0.61 M)
MNIMUM
LESS THAN 10' (3.1 M)
NOTE: NO HEIGHT
ABOVE PARAPET
SHALL BE REQUIRED
WHEN DISTANCE
FROM WALLS OR
PARAPET IS MORE
THAN 10' (3.1 M)
CHIMNEY: 3' (0.92 M)
MINIMUM
MORE THAN 10' (3.1 M)
CHIMNEY
CHIMNEY
CHIMNEY
WALL OR
PARAPET
WALL OR
PARAPET
Summary of Contents for FP10R
Page 2: ......
Page 6: ...Page 6 Installation and Operation Manual FP10 Lafayette II ENGLISH CERTIFICATION PLATE...
Page 75: ......
Page 76: ...NOTES...
Page 77: ...NOTES...