20
21
28
Valcom, Inc.
5614 Hollins Road
Roanoke, VA 24019
USA
P. 540-563-2000
F. 540-362-9800
www.valcom.com
Double Mount Installation
20) Hang the base of the pole on the mounting plate so that the lip is on top of the base, and the holes
for the screws are on the bottom of the base. Attach the wires from the pole to the wires in the gang box,
then use the two black base screws to attach the other side of the base to the mounting plate.
21) Power the clock. After testing the LED segments and presenting some diagnostic information, the clock
will display the time based off if its internal quartz oscillator. It will correct itself to show synchronized time
as soon as it receives data from a master clock.
WALL
CEILING