7 Safety instructions and regulations 7
Assembly 8
All wiring must be in accordance with Building
Regulations Part P and BS 7671 (IEE Wiring Regulations),
and must be carried out by a suitably qualified person.
8 Assembly
8.1 Assembly
location
m
5,
1
Fig. 8.1 Select assembly location
8.2
Installing the remote control unit
2
3
1
Fig. 8.2 Opening the remote control unit
Key
1 Casing
cover
2 Snap
arm
3 Casing
socket
The connection with the boiler is achieved via a 2-lead
bus line (eBUS).
To open the remote control unit, release the snap arm
(
2
) on the underside, fold the casing cover (
1
) up and
remove it from the casing socket (
3
).
15
Installation instructions VR 81 0020044392_00
Summary of Contents for VR 81
Page 4: ...0020124743_00 GBIE 032011 Subject to change Manufacturer Supplier ...
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ...0020044392_00 GB 102007 ...