background image

10

Operating instructions for auroSTOR 0020111120_02

Inspection and maintenance

An annual inspection/maintenance run for the solar 
heating system by a competent person is a prerequisite 
for ensuring that the solar heating system is perma-
nently ready for operation, reliable, and has a long work-
ing life.
It is important that your hot water cylinder is serviced 
annually. 
We recommend entering into a maintenance agreement.

e

 Danger!

Risk of death from electric shock!

Improperly executed work on the solar 
heating system can result in risk to life and 
limb. 

 

>

Never try to rectify solar heating system 
faults yourself.

 

>

Contact a competent person to rectify all 
faults.

a

 Danger!

Risk of injury resulting from improper 
maintenance or repair.

Failure to arrange for the system to be 
maintained and repaired and improper 
maintenance and repair can impair the 
operational safety of the unit, leading to 
personal injury and material damage.

 

>

Never attempt to perform maintenance 
work or repairs on the solar heating sys-
tem yourself. 

 

>

Always employ a competent person. 

Servicing

After servicing, the servicing engineer must complete 
the relevant Service Interval Record section of the 
Benchmark Checklist located on the inside back pages of 
this document.

Recycling and disposal

Both the Vaillant auroSTOR and its transport packaging 
consist mainly of recyclable raw materials.

6.1 Unit

You must not dispose of your Vaillant auroSTOR or any 
of its accessories in normal domestic rubbish. Make sure 
that the old unit and any accessories are disposed of 
properly.

6.2 Packaging

Arrange for the competent person who installed the unit 
to dispose of the transport packaging.

5 Inspection and maintenance
6 Recycling and disposal

Summary of Contents for VIHSGB210

Page 1: ...Operating instructions For the operator GB IE Operating instructions Solar heating system with auroSTOR Solar hot water system...

Page 2: ...ty instructions 5 3 Description of the unit 6 4 Operation 7 4 1 Operating the solar heating system 7 4 2 Controlling the solar heating system 7 4 3 Setting the hot water temperature 8 4 4 Switching of...

Page 3: ...ymbol that denotes useful tips and information Symbol for a required action 1 4 Applicability of the instructions These instructions apply for the following only Unit type Cylinder volume Article numb...

Page 4: ...r insufficient experience and or knowledge unless they are supervised by a person who is responsible for their safety or have been instructed by this person on how to use the unit Children must be sup...

Page 5: ...advice The temperature of the stored water could reach high temperatures after solar charging and your Vaillant solar installer will have fitted a tempering valve so as to pre vent this reaching the...

Page 6: ...Safety devices The solar cylinder has been provided with all safety and control devices for operation of the unvented domestic hot water supply Temperature pressure relief valve 90 C 7 bar Pressure r...

Page 7: ...b Caution Risk of damage from leaks Leaks in the water pipes between the cylin der and tap can result in water damage If a leak occurs close the cold water stop valve on the cylinder Contact a compet...

Page 8: ...he auroSTOR has been installed in a cupboard used for airing clothes make sure that clothing and other objects are not placed on the cylinder control devices pipes or other system compo nents i Always...

Page 9: ...form a competent person fluid or steam is escaping from the expansion relief valve Inform a competent person the controller issues a message telling me the sensor is faulty or there is a cable break I...

Page 10: ...for the system to be maintained and repaired and improper maintenance and repair can impair the operational safety of the unit leading to personal injury and material damage Never attempt to perform m...

Page 11: ...petent persons in accordance with all current and relevant safety building control and planning regulations and in full compliance with the manufacturer s instructions All unvented domestic hot water...

Page 12: ...kW 16 7 16 5 16 0 Flow rate for primary heat exchanger performance l min 23 3 Primary heat exchanger pressure drop mbar 79 78 79 Primary heat exchanger volume Liter 2 37 Primary heat exchanger surfac...

Page 13: ...ed valve 230 240 V 50 Hz Cylinder thermostat 230 240 V 50 Hz Thermal cut out solar 230 240 V 50 Hz Material data Cylinder body material Stainless steel 1 4521 Cylinder jacket material Polypropylene In...

Page 14: ......

Page 15: ......

Page 16: ...0020111120_02 GBIE 092013 Subject to change Manufacturer Supplier...

Reviews: