background image

5

Installation manual flue pipe for ecoCRAFT 0020058722_02

Tested and approved air/flue 
pipes - room-sealed

This chapter describes the peripheral conditions under 
which the ecoCRAFT condensing gas boilers can be fit-
ted to flue pipes supplied by the manufacturers shown 
in Table 4.1.

4.1 Description

-  with flue pipes checked and approved for the gas con-

densing boiler

- room-sealed operation

4.2 

Tested and approved air/flue pipes

The exhaust gas systems used must be clearly and un-
ambiguously identifiable and must be in agreement with 
one of the certificate numbers given in Table 4.1.
The layout and installation of the flue pipes must be in 
accordance with the specification and installation manu-
als provided by the manufacturer of the exhaust gas 
system. When the exhaust gas system is completely in-
stalled it must be marked with the prescribed identifica-
tion plate.

Flue pipes tested and approved for ecoCRAFT appli-
ances (GB)

Manufacturer

Material

Product 
designation

Certificate number

Address

GB

DW - Alkon

0432 - BPR - 119938/2004

Schiedel Rite 
Vent Ltd

Stainless 
steel

Prima Plus

-  EN 1856-2 T200 P1 W V2 

L50060 O200

- TUV 0036 CPD 9195 018

Schiedel Rite Vent Ltd

Crowther Estate, Washington, Tyne & Wear NE 38 0AQ

Tel.:  0044 191 416 11 50

www.schiedel.co.uk

Table 4.1  Manufacturers of air/flue pipes (GB)

System-certifi ed fl ue pipe - open fl ued 4

Summary of Contents for Flue pipe VKK SERIES

Page 1: ...For the heating engineer Installation Manual Flue pipe for ecoCRAFT VKK 806 3 E VKK 1206 3 E VKK 1606 3 E VKK 2006 3 E VKK 2406 3 E VKK 2806 3 E GB Modular gas condensing boiler ...

Page 2: ...2 Regulations 4 3 2 1 Regulations Great Britain and Eire 4 4 Tested and approved air flue pipes room sealed 5 4 1 Description 5 4 2 Tested and approved air flue pipes 5 4 3 Air flue pipe room sealed combustion air from the shaft 6 4 4 Air flue pipe room sealed combustion air through the external wall 8 4 5 Air flue pipe room sealed combustion air and flue gas evacuation via the roof 9 4 6 Air flue...

Page 3: ...ccordance with state of the art technology and recognised safety regulations The air flue gas pipe is designed to remove exhaust gas and to supply combustion air In case of improper non conventional use of air and exhaust pipes in connection with appliance types damage can be caused to the health and body of the user and others respectively other devices or material assets can be affected The dime...

Page 4: ...eference shall be given to the following regulations guidelines standards and rules The electrical connections to the boiler MUST be in ac cordance with the I E E Wiring Regulations and tested accordingly The Clean Air Act 1993 and the 3rd Edition of the 1956 Clean Air Act The Building Regulations England and Wales The Building Standards Scotland and any require ments determined by the local autho...

Page 5: ...rs given in Table 4 1 The layout and installation of the flue pipes must be in accordance with the specification and installation manu als provided by the manufacturer of the exhaust gas system When the exhaust gas system is completely in stalled it must be marked with the prescribed identifica tion plate Flue pipes tested and approved for ecoCRAFT appli ances GB Manufacturer Material Product desi...

Page 6: ...haust gas pipe is required by running through the cold section Otherwise it may cause the formation of ice in the ex haust pipe at low temperatures Caution The air supply must be installed in such a way that no rainwater can enter the boiler Rainwa ter ingress can cause a short circuit of electri cal components and can cause corrosion in the unit Caution Danger of fire Outside the ducting the exha...

Page 7: ...d DN 100mm square DN 80mm 28 4 30 0 50 0 ecoCRAFT VKK 2006 3 E round DN 60mm square DN 40mm 14 1 round DN 80mm square DN 60mm 44 9 round DN 100mm square DN 80mm 50 0 ecoCRAFT VKK 2406 3 E round DN 60mm square DN 40mm 9 3 round DN 80mm square DN 60mm 28 1 round DN 100mm square DN 80mm 50 0 round DN 120mm square DN 100mm 50 0 ecoCRAFT VKK 2806 3 E round DN 60mm square DN 40mm 6 5 round DN 80mm squar...

Page 8: ... 30 0 30 0 50 0 ecoCRAFT VKK 1206 3 E round DN 60mm square DN 40mm 30 0 30 0 50 0 ecoCRAFT VKK 1606 3 E round DN 60mm square DN 40mm 30 0 30 0 50 0 ecoCRAFT VKK 2006 3 E round DN 60mm square DN 40mm 50 0 ecoCRAFT VKK 2406 3 E round DN 60mm square DN 40mm 50 0 ecoCRAFT VKK 2806 3 E round DN 60mm square DN 40mm 50 0 Maximum length of horizontal pipes each 4 m air pipe plus 2 x 87 elbows and 4 m flue...

Page 9: ...0 ecoCRAFT VKK 2806 3 E 20 0 Maximum length of horizontal pipes each 4m air pipe plus 2x87 elbows and 4m flue gas pipe plus 2x87 elbows The air supply pipe has at least the same diameter as the flue gas pipe Minimum thermal resistance of the flue gas pipe in the cold section 0 4m2 K W Table 4 4 Maximum total pipe lengths combustion air and flue gas evacuation via the roof The distance between the ...

Page 10: ... ecoCRAFT VKK 806 3 E 30 0 30 0 30 0 ecoCRAFT VKK 1206 3 E 30 0 30 0 30 0 ecoCRAFT VKK 1606 3 E 30 0 30 0 30 0 ecoCRAFT VKK 2006 3 E 30 0 ecoCRAFT VKK 2406 3 E 30 0 ecoCRAFT VKK 2806 3 E 30 0 Maximum length of horizontal pipes each 4m air pipe plus 2x87 elbows and 4m flue gas pipe plus 2x87 elbows Minimum diameter of the air supply pipe 150mm Minimum thermal resistance of the flue gas pipe in the ...

Page 11: ...he time of installation G3 Terms and conditions apply to the warranty details of which can be found on the warranty registration card in cluded with this appliance Failure to install and commission this appliance in com pliance with the manufacturer s instructions may invali date the warranty this does not affect the customer s statutory rights 6 Disposal Make sure that the flue pipe is handed ove...

Page 12: ...0020058722_02 GB 032009 Subject to alterations ...

Reviews: