background image

Installation and maintenance instructions ecoTEC 0020029173_01

30

6.4.2 Cylinder 

charging

•  Switch on the boiler and the connected hot water 

cylinder.

•  Make sure that the cylinder thermostat is requesting 

heat.

• Push the "

i

" button.

If the cylinder is correctly charged the boiler runs 
through the status displays "

S. 20

" to "

S. 23

", until the 

boiler is running properly in normal operation and the 
display "

S. 24

" appears.

h

 Note!

If you connect your controller to a dual-cable 
eBUS line, specify the highest possible hot 
water temperature using the corresponding 
rotary knob. Specify the set target temperature 
for your cylinder at the controller.

Fig. 6.8  Display in charging mode

6.5 

Handing over the control to the owner

h

 Note!

Once the installation is complete, please affix 
the enclosed sticker (Item No. 835 593) 
containing the language used by the operator to 
the boiler.

The operator must be instructed in handling and 
functions of the ecoTEC boiler.
•  Hand over any instruction manuals intended for the 

user, as well as the appliance documents for safe 
keeping.

•  Read through the operating manual with the owner 

and answer any questions.

•  Draw special attention to the safety instructions which 

the owner must follow.

•  Make the operator aware of the need for regular 

inspection and maintenance of the system.

•  Make the operator aware of the need to keep the 

manuals in a handy location near the ecoTEC, but not 
in or on the boiler.

•  Instruct the user about measures taken to ensure the 

supply of combustion air and removal of flue gas. 
Point out that these measures, particularly, must not 
be altered.

•  Explain to the operator how to check the water 

level/filling pressure of the system and show the 
operator how to refill and bleed the heating system 
when the need arises.

•  Show the user the correct (economical) temperature, 

controller and thermostat valve settings.

a

 Caution!

The boiler may only be operated with its casing 
properly and permanently closed! Otherwise, 
under unfavourable conditions, it can result in 
material damage or even injury or death.

6.6 Vaillant 

warranty

Vaillant provide a full parts and labour warranty for this 
boiler.
The boiler must be installed by a suitably heating 
engineer in accordance with the Gas Safety (Installation 
and Use) Regulations 1998, and the manufacturer’s 
instructions. In the UK ‘CORGI’ registered installers 
undertake the work in compliance with safe and 
satisfactory standards.
All unvented domestic hot water cylinders must be 
installed by a heating engineer to the prevailing building 
regulations at the time of installation (G3).

Terms and conditions apply to the warranty, details of 
which can be found on the warranty registration card 
included with this appliance.

Failure to install and commission this appliance in 
compliance with the manufacturer’s instructions may 
invalidate the warranty (this does not affect the 
customer’s statutory rights).

6 Start-up

Summary of Contents for ecoTEC VU 656/4

Page 1: ...For the heating engineer Installation and maintenance instructions ecoTEC Gas fired wall hung high efficiency boiler VU 656 4 GB...

Page 2: ...aning the heat exchanger 40 8 3 3 Checking the burner 40 8 3 4 Installing the compact thermal module 40 8 4 Cleaning the condensate ducts and the condensate siphon 41 8 5 Cleaning the air separation s...

Page 3: ...nostics 44 9 1 1 Status codes 44 9 1 2 Diagnosis codes 45 9 1 3 Fault codes 48 9 1 4 Fault memory 48 9 2 Test programs 50 9 3 Resetting parameters to factory settings 50 10 Replacing components 51 10...

Page 4: ...or and burner 5 Ignition electrode 6 Water pressure sensor 7 Pump 8 Connection provision filling combined filling and emptying valve 9 Connection provision expansion vessel 10 Electronic box 11 Siphon...

Page 5: ...nadequate experience and or knowledge unless supervised by a person responsible for their safety or who has been given instructions from them as to how to operate the boiler Children must be watched t...

Page 6: ...systems of output greater than 45 kW Part 1 Fundamental and design considerations Part 2 Selection of equipment Part 3 Installation commissioning and maintenance BS 4814 Specification for Expansion v...

Page 7: ...tallations in cascade arrangement using the appliance type B23p a common non Vaillant flue system serving more than one appliance shall be used The requirements of the flue installation instructions m...

Page 8: ...he same wall 300 mm O From the wall on which the terminal is mounted N A P From a vertical structure on the roof N A Q Above intersection with roof 300 mm Table 3 1 Position of the termination in a fa...

Page 9: ...plied from the room or compartment the boiler is installed in 3 6 Electrical supply A 230 V 50 Hz single phase electricity supply fused to 3 Amp must be provided in accordance with the latest edition...

Page 10: ...n lead to corrosion also in the flue system during ambient air dependent operating of the boiler The boiler must be operated independently of the ambient air particularly in hairdressing salons carpen...

Page 11: ...hanging bracket centre of air flue gas pipe with 87 elbow 297 mm 2 Hanging bracket 3 Gas pipe 25 mm diameter gas connection R1 4 Connection provision expansion vessel 5 Connection for heating return 6...

Page 12: ...the installation template vertically and fix it to the wall Mark the positions of the drill holes for the hanging bracket and also the position of the wall opening for the flue pipe on the wall Remov...

Page 13: ...tion d Danger Danger of injury to persons and or material damage due to improper installation The Vaillant ecoTEC boiler may only be installed by a recognised skilled trade company who also assumes th...

Page 14: ...m 10 K 15 K 20 K Stand alone boiler WH 160 WH 95 WH 95 Two cascade arrangement WH 280 WH 160 WH 95 Three cascade arrangement WH 280 WH 280 WH 160 Table 5 1 Selection of the low loss header No electric...

Page 15: ...ween the boiler and the non oxygen barrier pipe It is essential that the boiler and the system have provision for water make up and expansion For more detailed information on examples of systems and s...

Page 16: ...assign the external heating pump function to the plug 1 additional relay the value 2 must be specified at diagnosis point d 26 in the 2nd diagnosis level see Chap 9 1 2 The low loss header ensures in...

Page 17: ...onsumer e g heating circuit 5 External cylinder primary pump 6 Cylinder A direct heating circuit and one hot water cylinder including charging pump and non return valve can be connected downstream of...

Page 18: ...pe via a gas isolation valve Screw the boiler s gas supply pipe 1 gas tight with the gas isolation valve 3 see Fig 5 10 To do this use the R3 4 compression fitting supplied with the boiler This is sui...

Page 19: ...kaway The ecoTEC boilers are equipped with a usual condensate collector from which the condensate is continuously removed via the drain pipe Connect the condensate drain of the boiler to a condensate...

Page 20: ...1 in accordance with the separate manual and fill it with water see also Chap 6 2 3 5 8 Electrical connection e Danger Risk of fatal electric shock through contact with live connections The electrical...

Page 21: ...4 8 5 8 2 Connecting controllers Mount the controllers in accordance with the corresponding operating and installation manuals The required connections to the electronic system of the boiler e g for e...

Page 22: ...diagram Fig 5 16 or to the selected controller see corresponding operating manual 5 8 4 Additional relay grey plug on the PCB and 2 in 7 multifunction module Additional relay grey plug on the PCB With...

Page 23: ...ed blue blue blue black black black black red red green green orange violet Flow sensor Return sensor Gas valve green yellow Igniter X14 Ignition electrode Appliance earth natural black Fan Mains Eart...

Page 24: ...e connection factory link fitted 230 volt mains input Fan Internal pump Additional relay e g external heating pump adjustable in d 26 see table 9 3 Fan 230V Cylinder primary pump blue pink grey green...

Page 25: ...eating system the cleaning agent must be applied carefully and subse quently removed from the heating system by draining it completely Cleaning agents should not remain in the heating system longer th...

Page 26: ...rops frequently the reason for the loss of heating water must be identified and eliminated Open the combined filling and emptying valve and the draw off valve slowly and add water until the required s...

Page 27: ...valve Ensure that the boiler has been installed in accordance with these instructions the integrity of the flue system and the flue seals as described in the flue installation instructions enclosed wi...

Page 28: ...checklist 6 3 3 Checking the gas inlet working pressure Ensure that the gas inlet working pressure can be obtained with all other gas appliances in the property working Remove the front casing from th...

Page 29: ...4 Checking the appliance function If the installation is complete and the gas setting has been checked perform a function check before starting up the boiler and handing it over to the operator Commis...

Page 30: ...anuals in a handy location near the ecoTEC but not in or on the boiler Instruct the user about measures taken to ensure the supply of combustion air and removal of flue gas Point out that these measur...

Page 31: ...value display flashes Save the new value by holding the i button pressed for about 5 seconds until the display stops flashing You can finish the diagnosis mode as follows Push the i and buttons simult...

Page 32: ...ot active 8 remote control eBUS not yet supported 9 legionella pump not active 1 d 28 Switch of relay 2 on the multifunction module 2 in 7 1 circulation pump 2 ext Pump 3 charging pump 4 vapour extrac...

Page 33: ...s switched on every 25 minutes for 5 minutes once the overrun time has elapsed 7 2 3 Setting of maximum flow temperature The maximum flow temperature for the heating is set at the factory to 75 C Unde...

Page 34: ...ay The ecoTEC electronics incorporate a feature that enables you to determine the maintenance intervals for the boiler This function serves to provide a signal after a specific adjustable number of bu...

Page 35: ...ctual condition of the respective boiler and compare it with the specified condition This is done by measuring checking and observing Maintenance is required in order to eliminate any deviations of th...

Page 36: ...ervice valves in the heating flow and return Remove the front casing from the boiler When removing any water carrying components ensure that water is kept away from all electrical components Always pe...

Page 37: ...mm hexagon socket spanner to turn the screw Turn to the left higher CO2 concentration Turn to the right lower CO2 concentration hNote Natural gas Only perform the adjustment in increments of 1 8 turn...

Page 38: ...correct them if necessary x x 8 Close the gas isolation valve and the service valves x 9 Dump the pressure in the boiler on the water side observe pressure gauge and check the charge pressure of the...

Page 39: ...ividual parts form the compact thermal module component H Danger Danger of burning or scalding There is danger of being burned or scalded at the compact thermal module and at all water carrying compon...

Page 40: ...trap via the opening 4 Allow the cleaning agent to take effect for approximately 20 minutes then rinse off the loose dirt To clean the coils you can use a brush with synthetic bristles but no aids wi...

Page 41: ...the PWM signal cable on the bottom of the fan 8 and the cable to the gas valve 10 Connect the gas supply 9 with a new seal to the gas valve Use the spanner flat at the flexible gas line to hold up the...

Page 42: ...ll the siphon cartridge with water Insert new seals at all points and check the condensate duct for leaks 8 5 Cleaning the air separation system H Danger Danger of burning or scalding All water carryi...

Page 43: ...replaced 8 7 Checking gas connection pressure inlet working pressure To check the connection pressure proceed as described in Chap 6 3 3 8 8 Checking the CO2 concentration To check the CO2 concentrat...

Page 44: ...mode DHW S 20 Hot water requirement S 21 Fan start up S 22 Pump pre run S 23 Ignition S 24 Burner on S 25 Pump fan overrun S 26 Fan overrun S 27 Mode pump overrun S 28 Burner off period Other S 30 Hea...

Page 45: ...simultaneously The display shows d 0 Scroll to the desired diagnosis number on the 1st diagnosis level with the or buttons see Table 9 2 Push the i button The display shows the relevant diagnosis info...

Page 46: ...mmer mode d 24 not relevant not relevant d 25 Hot water generation enabled by eBUS controller 1 yes 0 no d 29 Actual value sensor circulation water quantity Actual value in m3 h d 30 Control signal fo...

Page 47: ...lenoid valve 6 ext fault message 7 not active 8 remote control eBUS not yet supported 9 legionella pump not active d 50 Offset for minimum speed in rpm 10 adjustment range 0 to 300 factory setting 30...

Page 48: ...947 h Pressing the i again causes the display to switch back to the diagnosis point that was called up Table 9 3 Diagnosis codes at diagnosis level 2 continued 9 1 3 Fault codes The fault codes displa...

Page 49: ...tch off flame simulation Moisture on electronics electronics flame monitor defective gas solenoid valve leaking F 28 Failure during start up ignition unsuccessful gas meter defective gas pressure moni...

Page 50: ...pwards Push the i to operate the boiler now and to start the test programme Push i and simultaneously to exit the test programs You can also exit the test programs by not pushing any button for 15 min...

Page 51: ...box Use only new seals and O rings After completing the work perform a tightness check and function check see Chap 6 4 10 2 Replacing the burner d Danger Before replacing the component observe the saf...

Page 52: ...e both components at the same time it is essential to check whether the correct replacement display for this equipment variant is available You cannot use any other replacement displays Enter the numb...

Page 53: ...water volume when T 20 K 2750 l h max flow temperature approx 85 C Maximum operating pressure 3 bar condensate volume pH value 3 0 4 0 6 5 l h water content 6 5 l flue gas mass flow min max 6 5 30 3...

Page 54: ......

Page 55: ......

Page 56: ...0020029173_01 GB 082010 Subject to alterations...

Reviews: