Boiler installation sequence
24
Instructions for installation and servicing ecoTEC 839592_13
4
>
The boiler can be correctly flued, i.e. the flue terminal
position is located in accordance with these instruc-
tions and the air/flue duct can be installed in accord-
ance with the flue installation instructions supplied.
>
All necessary pipework can be connected, including
the pressure relief valve and condensate drain.
4.2.2 Unpack
the
boiler
To unpack the boiler, cut both plastic carton straps, open
box and lift out the polystyrene top packing. Lift the
cardboard box upwards.
i
Care should be taken not to scratch the white
surface of the boiler casing.
4.2.3 Using boiler template
60/100
256723_01
01 2
005
5
95
16
5
25
180
20
17
5
5
45
A
A
A
A
A
106
5
450
Fig. 4.2 Assembly template: example
>
Fix the paper template to the wall ensure that the
template is vertical.
The template shows:
– The position of the fixing holes for the boiler mount-
ing bracket.
– The position of the connections.
– The position of the flue exit hole.
Summary of Contents for ecoTEC plus
Page 75: ...Installation Commissioning and Service Record...
Page 78: ......
Page 79: ......
Page 80: ...839592_13 GBIE 012012 Subject to change Manufacturer Supplier...