0020308120_02 Air/flue pipe installation manual
31
5.9.6
Installing the variable terminal set below the
balcony
1
1
1
1.
When installing with an offset: Install the variable ter-
minal (
2.
Secure the extensions with the pipe clamps below the
balcony or on the wall (
3.
Install the bird-guard grille
(1)
from the elbow of the
VTK set in the sleeve for the last extension.
5.10
Installing the 80/125 mm diameter horizontal
wall/roof duct, article number 303209 or
0010035777
5.10.1 Scope of delivery
07
1020
70
3
1
2
4
1
Horizontal wall/roof duct
2
Wall collar, 125 dia-
meter (2 pcs)
3
70 mm clamp (2 pcs)
4
87° elbow
5.10.2 Installing the wall duct
150-155
15
3°
1
1.
Drill a hole.
–
Diameter: 130 mm
2.
Insert the air/flue pipe
(1)
into the wall opening.
3.
Secure the air/flue pipe with mortar and leave the mor-
tar to harden.
4.
Install the wall collar on the inside and outside of the
wall.
5.10.3 Installing the roof duct
150-155
15
3°
1
▶
Insert the air/flue pipe
(1)
without the external collar into
the dormer.
Note
The dormer is not provided by Vaillant and
must be created on-site.
Summary of Contents for ecoTEC plus VU Series
Page 1: ...en Air flue pipe installation manual ecoTEC plus VU VUW VUI 0020308120_02 29 09 2022...
Page 57: ......
Page 58: ......
Page 59: ......