GR APP LE LOA DER
V a h v a J u s s i 3 2 0
2011 Kreisi Metall
6
Maitenance table.
OBJECT
ACTION
Maintenance interval, working hours
8 h or after
working shift
40 h or after working
week
250 h
1.General
Check cylinders
and leakages
Check pins and
lockings
Check the condition of primary
structures
Check the bolts are tight.
2.Crane
Grease bearings Check pins and
lockings
Adjusting the racks
3.Booms
Grease slide
bearings
Lubricate upper
and lower surfaces
Check slide bearings and adjust,
change if necessary
4.Cylinders
Grease
articulation
bearings
Check pins and
lockings
Check hydraulic cylinders guides
and
bearings
5. Grapple
Grease slide
bearings
Check pins and
lockings
Check grapples fixing to rotator
6. Support legs
Grease glide
surfases
Before starting engine:
NB! Before starting the engine, check that all hoses from hydraulic
engine are connected correctly to hydraulic valve package. If the hoses
are not correctly connected the hydraulic system can have a malfunction
and vital parts of device can be damaged.
1. Check that oil volume in engine is in normal level(fasten the engine on steady ground).
2. To check the oil level, look at the oil meter on the oil tank.
3. Gasoline tank must be filled with right gasoline(octane 95).
4. Check that gasoline valve is in position ON.
5. Start the engine (engine with electric starter).
6. Pull the string(manual start engine).
7. After engine starts release start button (engine with electric start).
8. When working with crane keep the engine throttel according to working conditions.
When operating the engine use the user manual provided with the engine.