12
2.2.6 Sample probe valve assembly
Reference drawings
Dimensional drawing sample valve Mark 6
0806-1077
Part list sampling probe pipe connection Ø15 mm Ballast Monitor Mark 6M
0806-1265
Part list isolating valve Ø15 Ballast Monitor Mark 6
0806-1268
For taking a representative sample of the ballast water to measure the oil level content, a sample
probe valve assembly is provided. It comprises:
a probe, for penetration in the selected discharge line;
a gate valve, for manual closure upon completion of monitoring;
a pneumatic valve, for remote selection of the discharge line, so the line can be changed
whilst the monitor is in operation.
2.3 SAMPLING SYSTEM ARRANGEMENTS
Reference drawings
Dimensional drawing and parts list ballast skid Mark 6M
0806-1288
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter
Mark
6
0806-8035
A suggested installation configuration of the Oilcon
®
Oil Discharge Monitoring and Control System is
given in drawing
0806-8035
. Up to 6 sampling points can be catered for, although most ships will
have much less than this. The total number of valves that are contained in the system is depending
on the particular configuration on the ship.
The sample point is selected from the MCU in the ship’s cargo control room (CCR). This causes the
selected valve to open. When the system is in operation, water is drawn from the sample point by
the sample pump, passed through the detector cell and then discharged to the slop tank or
discharged overboard, depending on the installation.
The accuracy of the monitor is improved by the use of a flushing sequence before sampling
commences, at intervals during sampling and when the system is shut down after use. All the
flushing sequences are carried out automatically by the system.
The flushing sequence serves 3 purposes:
to clean the pipework
to keep the detector cell windows clean, which keeps the optical path un-obscured
to perform a zero check every time a flush sequence is activated
The flushing sequences can be operated manually from the MCU, if required.
The skid assembly, see drawing
0806-1288
, contains a pneumatically operated shuttle valve, which
facilitates the forward flush and backward flush. During the automatic flushing sequences on start
up, and on shut down, the valve activates to flush all the pipework using the fresh water supply and
sequentially selects between backward and forward flush. When the manual flush is operated,
valves are activated to allow fresh water into the system and an additional zero check is performed.
During sampling every 3 minutes, an automatic cleaning of the windows in the detector cell is
carried out. A pneumatic pump mounted in the skid assembly supplies high pressure fresh water
which is sprayed across each window. It will be noticed that the window wash sequence is indicated
on the MCU in the top left corner by “window wash”.
Summary of Contents for OILCON MARK 6M
Page 112: ...111...
Page 113: ...112...
Page 114: ...113...
Page 115: ...114...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 121: ...120...
Page 122: ...121...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 128: ...127 Drawing 1 0806 0005 Sheet 1 2...
Page 129: ...128 Drawing 2 0806 0005 Sheet 2 2...
Page 130: ...129 Drawing 3 0806 1041...
Page 131: ...130 Drawing 4 0806 1075...
Page 132: ...131 Drawing 5 0806 1076...
Page 133: ...132 Drawing 6 0806 1077...
Page 134: ...133 Drawing 7 0806 1260 Sheet 1 2...
Page 135: ...134 Drawing 8 0806 1260 Sheet 2 2...
Page 136: ...135 Drawing 9 0806 1265...
Page 137: ...136 Drawing 10 0806 1267...
Page 138: ...137 Drawing 11 0806 1268...
Page 139: ...138 Drawing 12 0806 1279...
Page 140: ...139 Drawing 13 0806 1285...
Page 141: ...140 Drawing 14 0806 1286...
Page 142: ...141 Drawing 15 0806 1287...
Page 143: ...142 Drawing 16 0806 1288...
Page 144: ...143 Drawing 17 0806 1621...
Page 145: ...144 Drawing 18 0806 1622...
Page 146: ...145 Drawing 19 0806 2032...
Page 147: ...146 Drawing 20 0806 2048...
Page 148: ...147 Drawing 21 0806 2050...
Page 149: ...148 Drawing 22 0806 5019...
Page 150: ...149 Drawing 23 0806 5026...
Page 151: ...150 Drawing 24 0806 8016...
Page 152: ...151 Drawing 25 0806 8023...
Page 153: ...152 Drawing 26 0806 8035...
Page 154: ...153 Drawing 27 0806 8038 Sheet 1 4...
Page 155: ...154 Drawing 28 0806 8038 Sheet 2 4...
Page 156: ...155 Drawing 29 0806 8038 Sheet 3 4...
Page 157: ...156 Drawing 30 0806 8038 Sheet 4 4...
Page 158: ...157 Drawing 31 0806 8039...
Page 159: ...158 Drawing 32 0806 8040...
Page 160: ...159 Drawing 33 0806 8070...
Page 161: ...160 Drawing 34 0810 2010...
Page 162: ...161 Drawing 35 0871 1213...
Page 163: ...162 Drawing 36 0899 1092...
Page 164: ...163 Drawing 37 0899 1163...
Page 165: ...164 Drawing 38 0899 1249...
Page 166: ...165 Drawing 39 0899 1256...
Page 167: ...166 Drawing 40 0899 1258...
Page 168: ...167 Drawing 41 0899 1259...