background image

  Operation

  

6

  Dimensions

  

3

  Operating Specifications

ZOO (1129.002)   

Moving the mixer lever upwards/downwards will increase/decrease the flow of water.
Moving the mixer lever from right to left will increase the water temperature. 
Pull the vertical control rod up to close the waste outlet and push down to open.

on = up    off = down 

hot = left    cold = right 

45mm

145mm

1/2”

Mono basin mixer - 

 

Minimum operating pressure 0.2 bar.  
Maximum operating pressure 5 bar

Mono bidet mixer - 

Minimum operating pressure 0.3 bar
Maximum operating pressure 5 bar

1 1/4”

300mm

138mm

Summary of Contents for Zoo

Page 1: ... which is non transferable Vado will at its option repair or replace free of charge any product or replacement part found to be defective The guarantee does not extend to any consequential loss or damage After repair or replacement the relevant guarantee period will be calculated from the original date of purchase The relevant guarantee periods are 1 Twelve years on chrome finish products 2 Three ...

Page 2: ...ions are made to the mains cold water supply WRC approved single check valves must be fitted to both hot and cold inlets This is a stated requirement of Water Supply Water Fittings Regulations 1999 Schedule 2 Section 6 G15 13 2 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer uni...

Page 3: ...om right to left will increase the water temperature Pull the vertical control rod up to close the waste outlet and push down to open on up off down hot left cold right 45mm 145mm 1 2 Mono basin mixer Minimum operating pressure 0 2 bar Maximum operating pressure 5 bar Mono bidet mixer Minimum operating pressure 0 3 bar Maximum operating pressure 5 bar 1 1 4 300mm 138mm ...

Page 4: ...connected to the left hand pipe Base ring Rubber washer Metal washer Threaded rod Nut Flexible pipes Control handle Aerator Dissemble the pop up waste and reassemble onto the basin Insert the vertical control rod with knob down through the hole in the back of the mixer body Unscrew the ball joint retainer on the side opening of the pop up waste Insert the short end of the horizontal control rod wi...

Reviews: