background image

8

Installation

During and after installation protect the outer parts of the valve to avoid damage to 

plated surfaces.
Place the covers over the copper pipes, followed by the nuts and the olives.
Push the valve onto the copper pipes and the mounting plate, tighten both the nuts 

on the inlets being careful not to damage the plated surface.

Cover

Olive

Nut

Shower hose 

connection

Cold

Hot

15mm copper 

pipe

Mounting plate

15mm copper 

pipe

Cover

Olive

Nut

9

Installation

From the underside tighten both grub 

screws to secure the valve in position.

Hex key

Shower hose

Place a rubber washer into the nut end of 

the hose and attach it to the valve outlet.

Nut end of 

shower hose

Washer

Summary of Contents for WG-179M-CP

Page 1: ...reference Installation Guide WG 179M CP Vado Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 aftersales vado com www vado com This instruction booklet covers these models WG 179M CP Version 1 1 8 17 where inspiration flows ...

Page 2: ...r if there is any uncertainty Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer unit Water Supply Water Fittings Regulations 1999 Schedule 2 Section 13 The fitting of isolating valves to the inlet feeds is advised for ease of maintenance Please take great care when installing this...

Page 3: ...4 Dimensions 124mm 147 153mm 118mm 22 5mm 48mm 40mm 5 Installation Quick guide 2 1 3 6 4 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 147 153mm 6mm ...

Page 4: ...is a small amount of adjustment on the inlet pipes to allow fitting onto the copper pipes Screw each side in or out as required ensuring that both sides are screwed in equally within the tolerance specified on the dimension page Remove the valve Fig 2 Remove the mounting plate from the back of the valve by releasing the two grub screws and pulling out the plate Place the mounting plate in the cent...

Page 5: ... mounting plate tighten both the nuts on the inlets being careful not to damage the plated surface Cover Olive Nut Shower hose connection Cold Hot 15mm copper pipe Mounting plate 15mm copper pipe Cover Olive Nut 9 Installation From the underside tighten both grub screws to secure the valve in position Hex key Shower hose Place a rubber washer into the nut end of the hose and attach it to the valve...

Page 6: ...libration as follows Remove the temperature control handle see fig 1 Ensure the step on the stop ring is located at 4 o clock see fig 2 Do not remove the stop ring Turn the spline of the thermostatic valve clockwise to decrease the temperature and anti clockwise to increase the temperature until 38 C is achieved at outlet Note the sensing part of the thermometer probe must be fully submerged in th...

Reviews: