
11
10
Installation
Finish the wall by tiling up to the
mortar guard, keep the final finished
wall surface between the min and max
marks.
Unscrew the 2 mortar guard screws
and remove from the wall.
Your valve is now ready to be
commissioned.
Please refer to page 14 to ensure your
valve is calibrated.
Connect hot supply to the lower right
inlet of the valve and cold supply to the
upper right inlet.
Connect outlet 1 & 2 to the desired
channels e.g. outlet 1 to the shower
head, outlet 2 to the bath.
Note:
outlet 3 will be connected to the
handset.
Mortar
guard
Mortar guard
screws
Cold
Hot
Outlet
2
Outlet
1
Handset
outlet
Installation
Select the position for the shower valve and offer the shower valve to the wall,
make sure the valve is level and mark the 6 fixing points with a suitable pencil, see
above for dimensions. Remove the shower valve from the wall, drill the holes to a
suitable depth for the wall plugs and secure with suitable screws.
Mortar
guard
Fixing
screws
77mm
Fixing points
90mm
263mm
MAX
MIN
Wall
Mortar guard (wall shown in minimum position)