
10
11
Installation
Mortar guard
During installation protect the parts by
leaving the mortar guard on the valve to
avoid damage to internal parts.
Remove the mortar guard by releasing
the two screws and pulling off.
Warning!
Please check for any hidden cables and pipes before drilling
holes in the wall.
The back of the valve must be set into the wall between (70mm minimum - 95mm
maximum) from the face of the finished wall.
Select the position for the shower valve and offer the shower valve to the wall, make
sure the valve is vertical with a level and fixed to a flat surface, mark the 4 fixing points.
Secure using suitable fixings.
Replace the mortar guard and secure in position with the two screws.
Installation
Use the supplied adapters if required.
Connect hot supply to the lower left inlet
of the valve and cold supply to the lower
right inlet. Connect the top outlets to the
desired channels.
Finish the wall by tiling up to the mortar
guard, keep the final finished wall surface
between the min and max marks.
Unscrew the 2 mortar guard screws and
remove from the wall.
Remove the screw from the temperature
stop arm and pull off.
Pull off the stop ring (note the position of
the step).
Turn off both non return valves by turning
clockwise, do not overtighten.
Maximum depth
Cold inlet
Outlet
Step
Stop arm
Screw
Stop ring
Hot inlet
Outlet
Outlet