background image

6

7

Installation

Operation

Before installing your new tap,  flush 

through the pipe work to ensure 

removal of debris, turn off the water 

supply.
Identify the tap, red (hot) left hand side 

and blue (cold) right hand side.
Ensure the seal is in place in the base 

of the tap.
Position the tap on the basin. From the 

underside of the basin fit the rubber 

washer and nut. Tighten the nut to 

clamp the tap to the basin. 

CAUTION:

 Do not over tighten the nuts 

as this may damage the basin.  

Repeat for the other tap.
Connect the water supply to the 

inlet pipes. The hot water should be 

connected to the left hand tap and cold 

to the right.

Control 

handle

Rubber 

washer

Nut

Cold

Hot

Seal

Turning the handle clockwise will increase 

the flow of hot water.  

Turning the handle anti-clockwise will increase 

the flow of cold water. 

Reviews: