VADO AXCES NURI AX-NUR-145A-CP Installation & User Manual Download Page 4

6

7

Installation 

Valve

Hot inlet

Outlet

Before installing your new mixer, flush through the pipework to ensure removal of 

debris, turn off the water supply.
       

Warning!

  Please check for any hidden cables and pipes before drilling holes in 

the wall.
The valve must be set into the wall by 40-65mm (see dimension page). 

If you are fitting the valve to a partition wall or a wall of particularly soft substrate 

you will need specialist fixings.
Select the position for the shower valve and offer the shower valve to the wall, 

mark the 4 fixing points at the top and bottom with a suitable pencil.  

Secure the valve to the wall with suitable fixings.
Make all connections to the valve. Connect hot supply to left inlet of the valve and 

cold supply to right inlet. 

Connect the outlet to the shower. 

Finish the wall, keep the final finished wall surface between the min and max 

dimensions.

Cold inlet

 

3

Installation - Quick guide

2

5

3

4

1

Wall plugs

Screws

Reviews: