6
7
Installation
Operation
Cold
Hot
Hot tap
- moving the tap lever to the left will increase the flow of water.
Cold tap
- moving the tap lever to the right will increase the flow of water.
Before installing your new mixer, flush through the pipe work to ensure removal of
debris, turn off the water supply.
Make sure that the O-rings are in position in the bottom of the mixer body.
Position the mixer on the bath. From the underside of the bath fit the rubber
washers and nuts. Tighten the nuts to clamp the mixer to the bath.
CAUTION:
Do not over tighten the nuts as this may damage the bath.
Connect the water supply to the inlet pipes. The hot water should be connected to
the left hand pipe.
Cold
control
handle
Hot
control
handle
Rubber
washer
O-ring
Nut
Rubber
washer
Nut
O-ring