background image

6

7

Installation 

Hot inlet

Outlet

Before installing your new mixer, flush through the pipe work to ensure removal of 

debris, turn off the water supply.
       

Warning!

  Please check for any hidden cables and pipes before drilling holes in 

the wall.
The valve must be set into the wall by 45-65mm (see dimension page). 

Note:

 The valve must be connected to rigid pipe work for support. 

Keep plastic cover in place during installation to protect the product's chrome finish.
Make all connections to the valve. Connect hot supply to left inlet of the valve and 

cold supply to right inlet. 

Connect the outlet to the desired channel. 
Finish the wall leaving a sufficient gap around the plastic cover to house the 

rubber plate gasket. Keep the final finished wall surface between the min and max 

dimensions.

Cold inlet

Plastic cover

Installation

Slide the plate over the valve, push onto the wall until it makes contact.
Carefully slide the control handle onto the valve and secure in position with the 

grub screw located within the handle using the hexagonal key supplied, replace the 

screw cover.

Note:

 

If the valve is sited within in a wet environment, it is recommended that once 

the valve is installed the plate is sealed with an adequate of sealant around three 

sides to provide a water-tight seal between the plate and the wall material, leaving 

the bottom edge free to allow for maintenance purposes.

Valve

Plate

Grub screw

Handle

Screw cover

Summary of Contents for AX-EKO-145-CP

Page 1: ...NCE MANUAL VALVE INSTALLATION USER MANUAL This instruction booklet covers model AX EKO 145 CP Version 1 1 8 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com ...

Page 2: ... department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer unit Water Supply Water Fittings Regulations 1999 S...

Page 3: ...4 5 Dimensions 115mm 1 2 45 65mm 100mm 160mm 70mm 1 2 Installation Quick guide 2 1 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 3 4 2 ...

Page 4: ... Finish the wall leaving a sufficient gap around the plastic cover to house the rubber plate gasket Keep the final finished wall surface between the min and max dimensions Cold inlet Plastic cover Installation Slide the plate over the valve push onto the wall until it makes contact Carefully slide the control handle onto the valve and secure in position with the grub screw located within the handl...

Page 5: ... the water temperature On Off Cold Hot Cleaning instructions Our products are finished to the highest standard and due care needs to be taken to ensure their looks are retained We recommend cleaning all products with a soft damp cloth ONLY and advise strongly against the use of ALL cleaning products i e powders and liquids If the above instructions are not followed this will invalidate your guaran...

Page 6: ...hone to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement product or component part assessed to be defective SEE NOTE 2 The guarantee whether standard or extended is non transferable to any subsequent owner All claims under the guarantee should be notified in the first...

Reviews: