CHANGING PAD BEAM
6. Position legs to the storage position and lower the
CM 3 to the ground (Fig. 3-1).
Fig. 3-1
7. Remove the pins connecting the beam to the lifter
(Fig. 3-2).
Fig. 3-2
8. Carefully lift the CM 3 away from the beam (Fig. 3-3).
Fig. 3-3
9. Slide the beam out of the way and put the other one in
its place (Fig. 3-4).
Fig. 3-4
10. Slowly lower the CM 3 onto the beam, making sure the
connection holes are lined up (Fig. 3-5). Or, with the CM
3 positioned at a comfortable working height, lift the
beam into place (Fig. 3-6).
Fig. 3-5
Fig. 3-6
Cm series
modular pad system
MODULAR PAD SYSTEM