background image

CHANGING PAD BEAM

6.  Position legs to the storage position and lower the  

CM 3 to the ground (Fig. 3-1).

Fig. 3-1 

7.  Remove the pins connecting the beam to the lifter 

(Fig. 3-2).

Fig. 3-2 

8.   Carefully lift the CM 3 away from the beam (Fig. 3-3).

Fig. 3-3 

9.  Slide the beam out of the way and put the other one in 

its place (Fig. 3-4).

Fig. 3-4 

10.  Slowly lower the CM 3 onto the beam, making sure the 

connection holes are lined up (Fig. 3-5). Or, with the CM 
3 positioned at a comfortable working height, lift the 
beam into place (Fig. 3-6).

Fig. 3-5 

Fig. 3-6 

Cm series 

modular pad system

MODULAR PAD SYSTEM

Reviews: