background image

MANUAL CONTROL OPERATION

1.  Start in the OFF position (Fig. 1-6).

Fig. 1-6 

2.  Turn the lever so the arrow points to LIFT (Fig. 1-7) to 

create vacuum on the pad. Once the gauge reaches 22 
it is safe to lift the load.

Fig. 1-7 

3.  To release the load, turn the lever so that the arrow 

points to RELEASE (Fig. 1-8).

Fig. 1-8 

4.  Once the gauge reaches zero the pad can be removed 

from the object it was lifting.

5.  Turn the switch back to the OFF position.

WIRELESS REMOTE CONTROL OPERATION

Fig. 1-9 

GETTING STARTED

1.  Press any button to begin operation. This will activate 

the transmitter and receiver on the matched equipment 
at the same time. 

2.  The green LED light (Fig. 1-9, 1) on the transmitter 

will blink 2 times per second when the transmitter and 
receiver are communicating. It will blink 1 time per 
second if there is no communication (i.e. no power to 
the CM 3/SL 2).

3.  The red LED light (Fig. 1-9, 2) on the transmitter will 

blink if the battery is low and should be replaced.

OPERATION

1.  The transmitter is configured for two-handed operation.
2.  To create vacuum on the pad to lift the load, lower the 

pad onto the material and hold blue button and press 
top red button (Fig. 1-9, 3) for 1-2 seconds. The CM 3/
SL 2 will continue to build vacuum after you release the 
buttons.

3.  Once the vacuum gauge is in the green range, it is safe 

to lift the load.

Cm series 

Operation

1

2

3

4

Reviews: