background image

vacon • 3

Local contacts: https://www.danfoss.com/en/contact-us/contacts-list/

T

ABLE

 

OF

 C

ONTENTS

                                                                                                                                                                                          Document: DPD00889B

Release date : 28.02.2019

1.

Delivered modules / installing AC chokes and power module .........................4

1.1

Products included in the delivery ......................................................................................4

1.2

Lifting the power module...................................................................................................4

1.3

Installing the power module ..............................................................................................5

2.

Ventilation........................................................................................................6

2.1

Steering the internal air flow.............................................................................................6

2.2

Arranging ventilation of the enclosure ..............................................................................7

3.

Grounding and cabling the unit ........................................................................8

3.1

Connecting the internal power cable.................................................................................8

3.2

Installing the optical fibers ................................................................................................9

3.3

Installing the motor cable..................................................................................................9

Summary of Contents for NXP series

Page 1: ...installation quick guide frames fr9 to fr14 ip00 modules ac drives vacon nxp...

Page 2: ......

Page 3: ...kes and power module 4 1 1 Products included in the delivery 4 1 2 Lifting the power module 4 1 3 Installing the power module 5 2 Ventilation 6 2 1 Steering the internal air flow 6 2 2 Arranging venti...

Page 4: ...2 2 x FR10 FI14 2 x FI13 power modules NOTE In FR9 the AC choke is inside the power module 1 2 Lifting the power module NOTE Place the lifting hooks symmetrically in at least two holes The lifting dev...

Page 5: ...ist 1 1 3 Installing the power module NOTE For detailed drawing see manual Frame Device width A mm Supporting bar range B mm Recommended cabinet width C mm FR9 480 A 50 mm 600 FR10 500 A 50 mm 600 FR1...

Page 6: ...s https www danfoss com en contact us contacts list 2 VENTILATION 2 1 Steering the internal air flow NOTE Outgoing air must be directed out of the cabinet so that it does not mix with incoming cooling...

Page 7: ...ter that the closure is well ventilated to keep the temperature below the maximum operating temperature Repeated overheating will shorten the lifetime of the converter Table 1 Ventilation requirements...

Page 8: ...www danfoss com en contact us contacts list 3 GROUNDING AND CABLING THE UNIT 3 1 Connecting the internal power cable See IP00 Module Installation Manual for details NOTE No external choke in FR9 FI F...

Page 9: ...on 9 Local contacts https www danfoss com en contact us contacts list 3 3 2 Installing the optical fibers 3 3 Installing the motor cable Min bending radius X2 X1 1 2 3 4 5 6 7 12025A_uk Cable fixing c...

Page 10: ...Document ID DPD00889B Rev B Vacon Ltd Member of the Danfoss Group Runsorintie 7 65380 Vaasa Finland www danfoss com...

Reviews: