Installation instructions
Built-in variants of gas hob
Multi-Sliders GAS411/421
1037456-05
26/07/2023
1037456-05
4
Flush installation
The layout of the hob to be fitted may differ from the hob illustrated!
H
Y – Y
B
S*
≥85
T
≥90
Drawer/
cabinet
Side panel
H
384
501
Y
Y
Ri
GAS411GSBZ
H
384
501
Y
Y
Ri
GAS421GSBZ
60
0
600
≥400
≥41.5
507±1
Z
390±1
≥41.5
600
≥400
≥41.
5
507±1
60
0
Z
390±1
≥41.5
Ra
8.5
0
-1
8.5
0
-0.5
Steel angle bonded
or screw mounted
Detail Z
R0–5
6.5
+1
0
6.5
+1
0
C
D
* The required clearance must be observed!
Model number
B
H
Corner radius Ra/Ri
C/D
GAS411GSBZ, GAS421GSBZ
≥195 mm
118 mm
5/2 mm
373/490 mm
B
Required clearance for service replacement over the entire cut-out area.
H
Dimension from the top of the work surface to the underside of the gas connection
Ri
Corner radii of appliance for base plate
Ra
Outer corner radii of cut-out
S
Minimum distance between the top of the work surfaces and any drawer
T
Minimum distance between the cut-out in the back and any drawer
Installation
▸
Create an accurate installation cut-out.
–
The mounting surface can be reamed out or created by installing wood/stone supports or using the steel angle set (see Ac-
cessories).
Access to the appliance from below via the entire cut-out area must be guaranteed. For servicing purposes, the appliance
base can be removed from below.
▸
Prepare the cut-out and appliance according to the specifications in the enclosed cementing-in instructions and align the appliance
in the cut-out.
▸
Fit the four adjusting braces along the circumference of the appliance to the bore holes provided and tension the appliance against
the worktop.
▸
Carefully cement the appliance in and leave the silicone sealant to dry for at least 24 hours.
▸
Connect to the electrical mains connection before inserting the appliance, if necessary.
Combination installation
The intermediate support kit H63789 is required for flush-mounted combination installation.