background image

INSTALLATION:

• Provide power to the required point of installation

• Remove the top cover as shown below in the image

• Using the top cover as a template, mark the location for, and drill 2 fixing holes

    ensuring not to infringe with any joists, gas or water pipes or electrical cables.

• Feed the mains cable through the cable entry hole in the top cover.

• Connect mains cable into push-fit terminal block ensuring correct polarity is observed,

   see the following figures for maintained, non-maintained and switched maintained

   wiring diagram.

• Connect flying lead from battery pack to the socket on the PCB.

• Refit the exit sign to the top cover ensuring all 4 lugs lock into place.

• Switch on the power supply and ensure green LED indicator is illuminated

 

       

Reviews: