INSTALLATION:
• Provide power to the required point of installation
• Remove the top cover as shown below in the image
• Using the top cover as a template, mark the location for, and drill 2 fixing holes
ensuring not to infringe with any joists, gas or water pipes or electrical cables.
• Feed the mains cable through the cable entry hole in the top cover.
• Connect mains cable into push-fit terminal block ensuring correct polarity is observed,
see the following figures for maintained, non-maintained and switched maintained
wiring diagram.
• Connect flying lead from battery pack to the socket on the PCB.
• Refit the exit sign to the top cover ensuring all 4 lugs lock into place.
• Switch on the power supply and ensure green LED indicator is illuminated