- 40 -
Error code
ĞƐĐƌŝƉƟŽŶ
^ŽůƵƟŽŶƐ
F13
Working mode change
F18
AC over current fault
of hardware
F20
DC over current fault of
the hardware
F23
F22
AC leakage current is
transient over current
Tz_EmergStop_Fault
F24
DC insulation impedance
failure
F26
The DC busbar is
unbalanced
F29
Parallel CANBus fault
1. When the grid type and frequency changed it will report F13;
2. When the battery mode was changed to “No battery” mode,
it will report F13;
3. For some old FW version, it will report F13 when the system
work mode changed;
4, Generally, it will disappear automatically when shows F13;
5. If still same, and turn off the DC switch and AC switch and
wait for one minute and then turn on the DC/AC switch;
6. Seek help from us, if can not go back to normal state.
F08
GFDI _Relay_Failure
1. When inverter is in Split phase(120/240Vac) or three-phase
system (120/208Vac) system, the backup load port N line
needs to connect ground;
2. If the fault still exists, please contact us for help.
AC side over current fault
1. Please check whether the backup load power and common
load power are within the range;
2. Restart and check whether it is in normal;
3. Seek help from us, if can not go back to normal state.
DC side over current fault
1. Check PV module connect and battery connect;
2. When in the off-grid mode, the inverter startup with big power
load, it may report F20. Please reduce the load power connected;
3. Turn off the DC switch and AC switch and then wait one
minute,then turn on the DC/AC switch again;
4. Seek help from us, if can not go back to normal state.
Leakage current fault
1. Check PV side cable ground connection.
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
Please contact your installer for help.
PV isolation resistance is too low
1. Check the connection of PV panels and inverter is firmly and
correctly;
2. Check whether the PE cable of inverter is connected to ground;
3. Seek help from us, if can not go back to normal state.
1. Please wait for a while and check whether it is normal;
2. When the hybrid in split phase mode, and the load of L1 and
load of L2 is big different, it will report the F26.
3. Restart the system 2~3 times.
4. Seek help from us, if can not go back to normal state.
1. When in parallel mode, check the parallel communication cable
connection and hybrid inverter communication address setting;
2. During the parallel system startup period, inverters will report F29.
when all inverters are in ON status, it will disappear automatically;
3. If the fault still exists, please contact us for help.
Summary of Contents for SUN-6K-SG05LP1-EU
Page 4: ...02 Z W D E W E W W ZD W d t Ws DWWd W K 1 2 5 8 10 11 12 9 6 3 4 7 13 16 17 15 14...
Page 5: ...03 2 2 Product Size D...
Page 7: ...05 W W z t W D D h manual h t W...
Page 8: ...06 D W d W W W sK E E E Not in the cool air directly E E E W d...
Page 9: ...500mm 500mm 07 D Z W h...
Page 10: ...08 Z Model Wire Size t Cable mm 35 Torque value max 5 2Nm t 50 5 2Nm...
Page 11: ...09 W W h E D D connected d recommended cables W Z t t t t t D PP PP t t...
Page 13: ...d 1 2 Temp sensor 11 ON 1 2 Inverter...
Page 15: ...13 GRID LOAD GEN PORT L N PE L N PE L N PE GRID LOAD GEN PORT ON 1 2...
Page 16: ...14 Ws d E W D d K Ws Ws Ws d unit d Ws Ws t Ws Ws Ws Ws K Ws Model Wire Size t Cable mm 4...
Page 44: ...42 d h product...
Page 46: ...44 Z D Z General Data W K d Z E D t t Z E 24 t W 5 years t E E E E E E s s E hE E Z E Z...
Page 48: ...46 Z W W Z d 4 No RS485B RS485 Pin 5 RS485A 1 2 3 4 5 6 7 8 Z W...
Page 49: ...47 Z WIFI RS232 1 No D GND WIFI RS232 2 3 4 5 6 TX 7 12Vdc 8 1 2 3 4 5 6 7 8 9 RX 9 d Z...
Page 50: ...48 d d K Ver 2 2 2022 10 10...