Study this manual carefully before any installation of the batteries.
The batteries must only be installed and operated by trained personnel.
Check the quantity of battery and accessories with delivery list.
Check the appearance whether there is damaged or leakage, if any damage is
detected, please do not proceed to the next installation.
14
6 Installation
6.2 Unpacking and Inspection
Make sure to disconnect and isolate the battery from any electrical source,
and then turn on the MCB (switch). Verify that the red ALM LED does not stay on for
more than 30 seconds.
Turn off the switch and continue with the installation.
6.3 Preparing for Installation
16
1 Make sure the battery is in off status.
2 Put the battery into cabinet or rack.
3 Use 4 M6 bolts to fix the battery pack on the cabinet.
4 Take out the grounding wires and connect one end to the ground point of
the battery pack and other end to the ground point of the cabinet.
6.4 Installation
The battery pack should be installed by professionally trained personnel, and
it is strictly forbidden to install it without permission.
Use insulated tools to avoid electric shock. If you use tools without insulation
protection, you need to wrap the exposed metal parts with insulation tape for
insulation treatment.
The battery pack is heavy, and at least 4 manpower must be prepared during
ATTENTION
the transportation and installation process. If possible, please use tools to assist in
handling.