Assembly
2
Place the end of the Tension Control Knob & Cable Assembly – Upper (29) into the
spring hook of the Tension Control Cable – Lower (30). Pull the Tension Control
Cable – Upper upwards against the spring pressure and push it into the gap on the
metal bracket of the Tension Control Cable – Lower as shown. Complete the fitting
as shown and if necessary, close the open section of the metal bracket slightly
with a pair of pliers as this will help to retain the cables. Connect the lower part of
the Exercise Monitor Link Wire (32) to the Exercise Monitor Sensor Wire (31),
ensuring a tight connection. Carefully lower the Handlebar Upright (2) onto the
Main Frame (7), then loosely fit 4 x M8 x 20mm Allen Bolts (27), 4 x M8 Spring
Washers (23) and 4 x M8 Curved Washers (28).
A-1.Hold the Tension Cable (30) below the metal bracket.
Turn the Control Knob to position “1”.
Remove the pre-fitted 4 x M8 x 20mm Allen Bolts (27), 4 x M8 Spring
Washers (23) and 4 x M8 Curved Washers (28) from the Main Frame (7).
Guide the lower part of the
into the formed metal loop on the
A-2.Still holding the Tension Cable (30), pull the Tension Control Knob (29) along with
the Handlebar Upright (2) away from the Metal Bracket (you will notice some
resistance at this stage) and guide the INNER Cable through the open slot in the
Metal Bracket.
A-3/A-4. Slowly release the tension on the UPPER Cable and guide it carefully into the
hole in the top of the Metal Bracket.
INNER Cable of the Tension Control Knob (29)
INNER Cable of the Tension Cable.
31
32
Note
Do NOT tighten the Handlebar
Upright at this stage.
The Tension Control Knob (29)
must be set at position "1".
A-1
A-2
A-3
A-4
29
30
Page
1
5