background image

 

 

- 2 -

 

COPYRIGHT 2004-2009 / 

Utility

Mate

®

 

Assembly Guide

  

 

 

Trailer Assembly Checklist 

 

 

_____ 

STAGE 1;  

1.

 

Gather the tools needed to assemble the trailer.11mm, 13mm, 17mm, 

19mm, 21mm, and 24mm sockets w/ extension. 11mm, 13mm, 17mm, 

19mm, 24mm open end wrench(s). 

2.

 

Locate 4 blocks that are approximately 12” tall. 

_____ 

STAGE 2; 

3.

 

Open & remove all parts from on top of the trailer frame.  

4.

 

Locate and remove the page that has the Certificate of Origin request on 

the back page of the Owner’s Manual for safe keeping. 

5.

 

Locate the bolts bag and empty contents into a contained area. 

6.

 

Tear the four corners of the bottom box which has the trailer frame sitting 

on it. This will result in the box laying flat. 

7.

 

Place a block under each corner of the trailer frame. This will result in the 

frame being raised off the ground. Make sure that the bottom of the trailer 

is facing upwards so that the springs, fenders, axle, and tongue can be 

mounted as shown in picture #3.  

_____ 

STAGE 3; 

Please refer to the attached parts list and assembly diagram for specific bolt sizes and 

parts placement. To complete stage 3 please locate 2-springs, 2-fenders, 1-axle, 1-

tongue, and the correct bolts for assembly of the undercarriage of the trailer. 

8.

 

Lay springs in spring track with spring eye facing towards front of trailer 

frame and the spring spoon facing the rear of the trailer.  

9.

 

To correctly place fenders into position, make sure the longer mount 

bracket is facing the rear of trailer frame. 

10.

 

Using parts B-13, 14, 15 securely attach springs and fenders to the trailer 

frame. 

11.

 

Lay axle across springs with the nipple on each spring into the nipple hole 

on the axle. 

12.

 

Using parts A-7, A-8 (“U” bolts and spring plate) securely attach the axle to 

both springs. 

13.

 

Attach parts A-15 (the wheels) to the axle (A-9) with parts B-17 (lug nuts). 

Refer to owner’s manual for proper torque (80 lbs.) and maintenance. 

14.

 

Lay part A-2 (tongue) into load bearing guide, making sure the tongue stand 

is pointed up. Attach tongue with part B-4, 5, 6. 

15.

 

Connect the 12v trailer frame wire plug to the 12v tongue wire plug. 

16.

 

Attach part B-7, 8 (removable L bolt & pin)to secure the front of tongue to 

trailer frame. 

Reviews: