Storage
If the machine is not required for immediate installation, the machine should be stored in a clean, dry area protected from the
weather. The intake and discharge port covers must remain in position until the machine is installed.
For a storage period longer than 60 days, we recommend the following 2 points:-
The shaft be turned a few revolutions by hand to ensure the machine is running free every month until the machine is
installed.
Loosen any drive belts fitted.
The green protective coating on the shaft remains effective for approximately 1 year. If the machine is stored for a longer period of
time, the coat must be renewed.
Handling
Skilled personnel working in accordance with safe working practices must carry out the lifting of machines. Before lifting
the correct equipment must be available. Certified cranes, jacks, slings, and lifting beams must be capable of carrying
the weight of the machine to be lifted. Do not use the shaft extension for lifting or moving the machine.
For weights see above in Technical Specification.
Installation
Before commencing installation, a site specific risk assessment, method statement and hazard identification list must be completed and
adhered to. All work must be carried out in a safe area.
Utile Engineering trained personnel or those trained to an equivalent standard should carry out installation, any claims for damage due
to faulty installation will be void.
The machine is delivered ready to be connected, with only the removal of the intake and discharge protection covers. All warning
labels and instructions must be observed and retained with the machine. Before installation, ensure there is no damage to the machine
and that it turns freely by hand.
Typical tools required for installation include: -
Set of spanners
Pipe Wrenches
Set of screwdrivers
Hacksaw
Hammer / mallet
Drill (low voltage)
Typical maximum recommended hex head bolt tightening torques for various grades of fixings are shown in the table below.
All fixings should be clean and have a light coating of lubricant or anti-seizure compound added to both the nut and male thread.
Maximum Recommended Hex Head Bolt Tightening Torques for Various Material Grades
Bolt Size
Grade 8.8
Grade 10.9
Grade A2 & A4
M4
3 Nm
4 Nm
2 Nm
M5
6 Nm
8 Nm
4 Nm
M6
10 Nm
15 Nm
6 Nm
M8
25 Nm
35 Nm
15 Nm
M10
50 Nm
70 Nm
30 Nm
M12
87 Nm
122 Nm
50 Nm
M16
210 Nm
299 Nm
121 Nm
M20
412 Nm
578 Nm
224 Nm
M24
711 Nm
1000 Nm
400 Nm