
19
LWCO
(PS-122)
HIGH LIMIT
FLAME
P3-4
THERMOSTAT
P3-7
R
W
P3-9
1013-10 CONTROL
P1-2
CONTROL
AQUASTAT
P3-3
P3-6
P3-1
(MANUAL RESET)
SAFETY SWITCH
CASTING TEMPERATURE
+ 0.5" WC
1
3
AIR PRESSURE
SWITCH (N.O.)
SET AT
2
DIFFERENTIAL
1
P2-1
INDICATOR LIGHTS
IGNITER
VALVE
POWER
PURGE
LOGIC & TIMERS
ELECTRONIC
MICROPROCESSOR
4K
2K
1K
3K
5K
GAS VALVE
4K1 3K1
P3-5
24 VAC
4
5
P2-2
P3-2
BLOWER
P5-1
1K1
P10-1
2K1
P7-1
P4-1
TRANSFORMER
P1-1
120 VAC
3
P1-3
1
HOT SURFACE IGNITER
P12-1
P6-1
5K1
P12-2
5K2
P6-2
P10-3
CIRCULATOR FIELD WIRED
P5-3
P10-2
P7-3
P4-3
P7-2
(NOTE: USE COPPER CONDUCTORS ONLY)
ON/OFF
BLK
HOT
L1
WHT
L2
SWITCH
120 VOLT POWER SUPPLY
NOTE: If any of the original wire as supplied with this appliance must be replaced, it must be replaced with type 150°C
Thermoplastic wire or its equivalent.
ELECTRICAL WIRING
Figure 14B -Ladder Wiring Diagram
Summary of Contents for UB90 125
Page 30: ...30 SERVICE HINTS DETAILED SEQUENCE OF OPERATION ...
Page 36: ...36 Troubleshooting Chart 2 TROUBLESHOOTING ...
Page 39: ...39 Troubleshooting Chart 5 TROUBLESHOOTING ...
Page 42: ...42 This Page Intentionally Left Blank ...
Page 44: ...UTICA BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...