9 - START UP PROCEDURE
9.13 Parameter Settings
Program boiler electronic board parameters as follows:
• Press
and
together, hold them down for 6
seconds until program “
P01
” appears on the display
alternated with the set value;
• Press
or
to scroll the list of parameters;
• Press
, value of selected parameter begins
flashing, press
to change the value;
• Press
to confirm the value or press
to exit
without saving.
Further information in regards to parameters listed in the
following table are supplied together with required accessories
if necessary.
9.14 Description Of Parameters: Factory Settings
FACTORY SETTINGS
125-165
150-205
P01
Manufacturer information
01
P02
Gas used
00
= Gas A (Natural Gas)
01
= Gas E (LPG Gas)
00
P03
Hydraulic system
00
= instantaneous appliance
03
= instantaneous appliance with pre-heat function
04
= heating only appliance with DHW thermostat
05
= appliance with external storage indirect tank
08
= heating only appliance
13
= instantaneous appliance with pre-heat function for solar application
08
00
P04
Programmable relay 1 setting (optional):
00
= no function is associated
01
= close contact with a room thermostat request (other than ECR thermostat)
02
= close contact with a ECR room thermostat request
03
= relay for indicating low water pressure
04
= relay for error code display
05
= relay for kitchen fan function
07
= relay for post circulation pump
09
= DHW relay on with DHW program setting
10
= DHW relay on with DHW request; if
P64
= 1 relay on with CH and DHW request
13
= relay for Cooling function
14
= close contact with room thermostat request (120V~) with post circulation
15
= close contact with open therm remote control request with post circulation
02
P05
Programmable relay 2 setting (optional):
(Same configurations as Relay 1-
P04
)
04
parameters continued on
next page
For Natural Gas :
Input (MBH)
=
3600 x cu ft
seconds
Example: Natural Gas - Gas flow from
Meter = 2 cu ft
Measured time = 72 seconds
=
3600 x 2 cu ft
= 100 MBH
72 seconds
For Propane (LP):
Input (MBH)
=
9160 x cu ft
seconds
For Metric formulas- See Glossary
2.
Compare measured input to table below. If calculated
input is not in range given in Table below, check firing
rate again after setting the combustion following steps in
section 9.10.
Input Rate (MBH)
Table 9-2 Input Rate @ High Fire (MBH)
Approximate Rate @
100% Fire (MBH)
Size
125
125
150
153
165
164
205
205
240011941 REV B, [03/31/2018]
Summary of Contents for MAC-150
Page 2: ...MAC 205 ...
Page 4: ...MAH 165 ...
Page 65: ...61 APPENDIX A WIRING DIAGRAMS A 1 MODELS 125 Heat Only 240011941 REV B 03 31 2018 ...
Page 66: ...62 APPENDIX A WIRING DIAGRAMS A 2 MODELS 165 Heat Only 240011941 REV B 03 31 2018 ...
Page 67: ...63 APPENDIX A WIRING DIAGRAMS A 3 MODELS 150 Combi 240011941 REV B 03 31 2018 ...
Page 68: ...64 APPENDIX A WIRING DIAGRAMS A 4 MODELS 205 Combi 240011941 REV B 03 31 2018 ...
Page 69: ...65 NOTES 240011941 REV B 03 31 2018 ...
Page 70: ...66 NOTES 240011941 REV B 03 31 2018 ...
Page 81: ...9 125 WITH ZONE CIRCULATOR PUMPS 125 with Zone Circulator Pumps PN 240011430 REV G 03 31 18 ...
Page 84: ...12 125 WITH ZONE VALVES PIPING DIAGRAM 125 with Zone Valves PN 240011430 REV G 03 31 18 ...
Page 90: ...18 165 with Zone Valves 165 WITH ZONE VALVES PIPING DIAGRAM PN 240011430 REV G 03 31 18 ...
Page 94: ...22 150 205 WITH ZONE PUMPS WIRING DIAGRAM 150 205 With Zone Pumps PN 240011430 REV G 03 31 18 ...
Page 102: ...30 MODEL 125 Heat Only 125 HEAT ONLY WIRING DIAGRAM PN 240011430 REV G 03 31 18 ...
Page 103: ...31 MODEL 165 Heat Only 165 HEAT ONLY WIRING DIAGRAM PN 240011430 REV G 03 31 18 ...
Page 104: ...32 MODEL 150 Combi 150 COMBI WIRING DIAGRAM PN 240011430 REV G 03 31 18 ...
Page 105: ...33 MODEL 205 Combi 205 COMBI WIRING DIAGRAM PN 240011430 REV G 03 31 18 ...
Page 110: ...38 Low Water Cutoff Detail LOW WATER CUTOFF NO NO YES PN 240011430 REV G 03 31 18 ...
Page 111: ...39 NOTES PN 240011430 REV G 03 31 18 ...
Page 112: ......
Page 115: ......