7
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
SLA
S1
7
. Place the wall panel corner left & right (WCFS)
on the base bar (BS2S). Line up the holes with base
bar and use (S1) screws with washers to secure.
Make sure the overlapping
position is as shown in fig.1
Note
Fig.2
BS2S
BBF
Fig.1
WFL
PW
8
. Use (S3) bolt and nut with washer to join together
the wall panels.
S3
Fig.1
PW
Fig.2
S1
PW
Fig.1
SLA
1
1
1
1&2
9
. Place the sliding channel left (SLA) on top of the
wall panel (WFL) from inside. See the position in
fig1. Line up the holes with wall panel use (S1)
screws with washers to fix. See fig. 2
WCFS
WCFS
WCFS
WCFS
WFL
WFL
WFL