6
SRA
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
5
. Insert two pieces of (TS) Top slider into the sliding
channel. See blowup.
Make sure the position of the
projection on (TS) towards
inside.
Note
TS
SRA
TS
Front
Fig.1
6
. Place the wall panel (WFL) on the base bar (BBF)
front left side of the shed. Line up the holes with
base bar. Secure with (S1) screws with washers
from outside.
S1
WFL
BBF
Front
Fig.1
PW
4
. Place the sliding channel right (SRA) on top of
the wall panel (WFR) from inside. See the position
in fig.1. Line up the holes with wall panel. Use (S1)
screws with washers to fix. See fig. 2 .
Fig.1
Fig.2
SRA
S1
PW
WCF
1&2
WFR
WFR
SRA
1
1
WCFS
WCFS
WFL