4.
Install film rolls onto supply mandrels as per the threading diagram below. Top
and bottom mandrels are colored coded in reference to their location.
5.
Plug power cord into suitable 115VAC outlet.
6.
After film is loaded per the threading diagram, switch drive switch to the forward
position. (Motor will only operate if drive switch is in a selected position and foot
pedal is depressed).
7.
Locate threading board supplied with machine.
Page 4