background image

 

6.How to Change Heater

 

         

 

 

 

 

 

 

 

 

 

                                                                                                   

                                                                                                                                                                                                                                                                                                                                                   

 

 

 

 

 

 

 

 

7.Sub Menu Introduction

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Take off the heater. Then do the 

opposite operation can change a new 

heater onto the machine 

 

7.1 Language setting.we offer 4 

language for customer needs. 

English/Spanish/Russia/Portuguese. 

(fig.7.1). Once finish setting,go to 

next page. 

 

In the time setting page, there is sub menu button, move the cursor to the button, 

press 

“set” button to enter into sub menu 

           

7.1 

 

 

 

Plug off the 4 phase plug   

 

 

 

Summary of Contents for GS-206M

Page 1: ...and repair Incorrect assembly or repair could increase the risk of fire electric shock or injury to persons when the equipment is used 7 This appliance is not intended for use by persons including chi...

Page 2: ...nel Guide Operating Instructions Connecting the System 5 Turning the System On 6 Adjusting the Temperature 6 7 Adjusting the Time 7 Printing and Pressing 8 9 How to Change Heater 9 Sub Menu Setting 10...

Page 3: ...s max Temperature Range Max 220 430 Time Range 0 999S Machine Size 65 2 33 9 26cm Packing Size 73 43 37cm Packing Weight 23kg Maximum Paper Printing Size 11oz mug 206 95mm L W 15oz mug 206 105mm L W S...

Page 4: ...4 Machine View...

Page 5: ...uires a full 20 amp grounded circuit for 120 volt operation 240 Volt GS 206M requires a full 10 amp grounded circuit for 240 volt operation EXTENSION CORDS If used should be as short as possible and n...

Page 6: ...1 Press and button to select different heater fig 3 2 3 2 For heater 1 2 and 3 4 press set button to choose start temp or finish temp press and button to set temperature For heater 5 and 6 press set...

Page 7: ...d no 2 heater can only be set temperature at once time together because left air cylinder close the heater 1 2 together Heater 1 2 can set start temp and finish temp 2 heater 3 4 represent no 3 and no...

Page 8: ...3 4 must work with two mugs inside together working only with 1 mug inside will damage the machine 3 Each heater s temperature is separately controlled by different triac can be calibrated separately...

Page 9: ...ew heater onto the machine 7 1 Language setting we offer 4 language for customer needs English Spanish Russia Portuguese fig 7 1 Once finish setting go to next page In the time setting page there is s...

Page 10: ...s not correct fig 7 2 Once finish setting go to next page 7 3 Fahrenheit and Celsius setting fig 7 3 Once finish setting go to next page 7 4 Auto sleep setting Customer can set auto sleep time Once ti...

Page 11: ...brightness of the screen fig 7 5 Once finish setting go to next page 7 6 Counter Collection Here customer can see how many mugs have been printer by each heater This setting can not be changed fig 7 6...

Page 12: ...12 Exploded Views GS 206M contains 4 main parts 1 Machine base assemble 2 Control box assemble 3 Heating elements assemble 4 Pressure system assemble...

Page 13: ...w M3x6 2 3 J 03 04 0011 Switch power supply 1 4 J 03 04 0077 Socket 1 5 J 03 06 0077 Countersunk screw M3x8 2 6 J 03 04 0079 On off switch 1 7 J 02 04 0138 Circuit breaker 10A 1 J 02 04 0139 Circuit b...

Page 14: ...597 Top Cover 1 2 J 03 04 0002 4 phase plug 4 3 J 03 06 0165 Ball headed bolt M5 12 6 4 J 03 04 0166 Circuit board GSK 07 1 5 J 03 06 0117 Ball headed bolt M4 10 4 6 J 03 01 0025 Sticker 1 7 J 03 05 0...

Page 15: ...15 3 Heating Element Assemble...

Page 16: ...J 03 06 0032 Handle Screw 16 5 J 03 05 0448 Supporting pillar 2 6 J 03 05 0404 Heater fix board 1 2 7 J 03 05 0405 Heater fix board 2 1 8 J 03 05 0412 Bottom heater base 4 9 J 03 05 0399 Door type cov...

Page 17: ...l headed bolt M4 10 6 2 J 03 05 0409 Arc supporting plate 2 3 J 03 05 0410 Supporting board 1 1 4 J 03 05 0411 Supporting board 2 1 5 J 03 05 0407 connector 2 1 6 J 03 06 0103 Ball headed bolt M5 10 1...

Page 18: ...0148 Magnet switch 1 3 J 03 03 0003 Ball Shape Handle 1 4 J 03 06 0213 Screw M10 100 1 5 J 03 06 0127 Nut M10 1 6 J 03 05 0595 Connecting sheet 1 7 J 03 06 0140 Ball headed bolt M5 8 1 8 J 03 05 0596...

Page 19: ...19 Electrical Schematic...

Reviews: