![USC LPV100 Operator'S Manual Download Page 21](http://html1.mh-extra.com/html/usc/lpv100/lpv100_operators-manual_1064066021.webp)
Page 21
TD-09-06-1064 LPV 100 SEED TREATER
17.
Have a certified electrician provide power to the seed treating system. Provide
convenient shutdown switches, comply with local electrical codes and ensure that
the system is properly grounded and bonded. The USC system must be connected
to the same electrical requirements as specified in the main control panel on the
power requirement tag, or the electrical schematic shipped with the piece of equip-
ment. This will power the USC LPV seed treater and any attached conveyors. This
includes treater, weighing equipment, pump stands, conveyors, control panels, etc.
17
18.
Flexible conduit is recommended for electrical connections.