![USC LPV100 Operator'S Manual Download Page 17](http://html1.mh-extra.com/html/usc/lpv100/lpv100_operators-manual_1064066017.webp)
Page 17
TD-09-06-1064 LPV 100 SEED TREATER
LPV AUTOMATED TREATER SET
-
UP (ALL TREATERS)
After the actuator is installed it should move freely by hand.
If something is binding, damage to the actuator or the mounting
brackets could occur.
NOTICE
6.
Anchor the seed treater in position to prevent the machine from moving during
operation.
7.
Inspect machine thoroughly for screws, bolts, fittings, etc. which may have come
loose during shipping.
8.
The pump stand(s) should be placed on level ground close to the seed treater.
9.
Attach the chemical tubing from the pump stand(s) to the static mixer on the seed
treater (below). Additional tubing may be added or removed to accommodate your
installation.
Static Mixer
Assembly