Choose a suitable location to mount the G9 Controller
•
Carefully choose a location inside the vendor door or cabinet to mount the G9
Controller. Make sure the G9 MDB, DEX and Serial cables will be able to reach their
connection points to the vendor MDB cables, DEX port and the Card Reader cable.
Make sure the cabling is not going to get pinched by or interfere with moving parts
in the vendor.
•
Also make sure you will be able to see the service buttons and LEDs on the G9
Controller and manipulate the “Service” – “Fill/DEX” – “END” and signal test
buttons when needed. You will also need to access the “Hand Held DEX”
receptacle if you use hand held DEX devices on your equipment.
•
When locating the antenna, avoid positioning it near the vendor control board.
•
Locate the antenna on top of the vendor door or cabinet if possible. If you need to
locate the antenna inside the vendor, try to position it directly behind the Lexxan
or glass front . Do not locate the antenna where it will be surrounded on all sides
by metal as this will greatly reduce signal quality.
•
DO NOT coil the antenna wire. This will also reduce signal quality. This wire should
be stretched out as best possible and secured so it will not be pinched or cut.
Summary of Contents for ePort G9
Page 1: ...Installing the USAT G9...
Page 2: ...ePort Serial number and Customer Service phone number are on every box...
Page 3: ...What s in the kit...
Page 4: ...What s in the kit...
Page 5: ...G9 Controller and cable connectors...
Page 6: ...Aux Antenna and DEX receptacles...
Page 7: ...Standard antenna and connector...
Page 8: ...Card Reader mounting screw holes cable and connector...
Page 11: ...Connect to the MDB bus with the two 6 position connectors of the G9 MDB cable...
Page 12: ...Antenna connection to G9 Controller...
Page 13: ...Card Reader cable connection to G9 Controller...
Page 16: ...Card reader mounted in second cutout...
Page 17: ...Inside view of Card Reader with flange plate...
Page 22: ...Swipe A Card Unit is ready for business G9 Green LED Blinking Card Reader Welcome Message...
Page 23: ...Authorizing a card Authorizing Card is approved ready to vend...
Page 24: ...User is prompted through the vend process...
Page 26: ...Thank You Message is displayed...
Page 28: ...RSSI CSQ LED Chart...
Page 29: ...AMS Card reader opening Bill acceptor opening AMS Vendors...
Page 33: ...Royal 500 with Card Reader Kit High Gain Antenna...
Page 34: ...G9 LED MATRIX for basic troubleshooting Blinking x2 number of blinks On solid...