The GreenWave Carbon tank must be filled with gravel and media prior to installation. It is
good practice to fill it with water and allow it to soak while the other components are installed.
A simple inlet and outlet connection is all that is required for installation. Please review
operating pressures, temperatures and water chemistry limitations to ensure compatibility.
Specifications
Inlet/Outlet Connection
3/4” - 1” PVC
Temperature
38° - 100°F
pH
6- 9
Ferrous Iron, Max*
0.0 mg/L
Manganese, Max*
0.00 mg/L
Copper, Max*
1.3 mg/L
Water Pressure
15 min, 100 max (PSI)
*See note about iron, manganese and copper on page 5.
Mechanical Specifications
Max Service Flow (gpm)
13
Dry Weight (lbs)
83
Service Weight (lbs)
159
Dimensions
(nominal - inches)
A
58.5
B
56
C
13
D
2.5
E
3.0
Using the GreenWave with other water treatment equipment.
Due to the unique properties of the GreenWave system, there are some specific requirements
for using the GreenWave in conjunction with filtration or other forms of water treatment.
1. Do not install any filters after the GreenWave or before any devices for which scale
prevention is required. POU filters, e.g. carbon or RO are exempt from this requirement.