General and Commercial Installation Checklist
WATER PRESSURE:
A minimum of 25 pounds of water pressure is required for regeneration valve to
operate effectively.
ELECTRICAL FACILITIES:
A continuous 115 volt, 60 Hertz current supply is required. Make certain the
current supply is always energized and cannot be turned off with another switch.
EXISTING PLUMBING:
Condition of existing plumbing should be free from lime and iron buildup. Piping
that is built up heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate
iron filter unit should be installed ahead of the water softener.
LOCATION OF SOFTENER AND DRAIN:
The softener should be located close to a
drain.