6
Visit us online at www.USWaterSystems.com Give us a call at: 1-800-608-8792
Specifications
Before Starting Installation
Tools, Pipe, and Fittings, Other Materials
Channel Locks
Screwdriver
Teflon tape
Razor knife
Two adjustable wrenches
Additional tools may be required if modifi-
cation to home plumbing is required.
Plastic inlet and outlet fittings are included
with the softener. To maintain full valve
flow, 1” pipes to and from the softener fit-
tings are recommended. You should main-
tain the same, or larger, pipe size as the
water supply pipe, up to the softener inlet
and outlet.
Use copper, brass, or PEX pipe and fit-
tings.
Some codes may also allow PVC plastic
pipe.
ALWAYS install the included bypass valve,
or 3 shut-off valves. Bypass valves let you
turn off water to the softener for repairs if
needed, but still have water in the house
pipes.
5/8” OD drain line is needed for the valve
drain.
A length of 5/8” OD drain line tubing is
needed for the brine tank over flow fitting
(optional).
Extra Course Grade or Crystal water sof-
tener salt is needed to fill the cabinet or
brine tank.
Continuous operation at flow rates greater than the service flow rate may affect capacity and efficiency performance.
The manufacturer reserves the right to make product improvements which may deviate from the specifications and
descriptions stated herein, without obligation to change previously manufactured products or to note the change.
The above capacity and flow rate specifications have not been validated by WQA.