background image

 

Ground Level Shim and Screw Cap

Assembly Guide

O U T D O O R  F I T N E S S  S O L U T I O N S

2

 

3

 

ABS

Galvanized steel

Material

Plastic cap (1 pcs)

 

Anchor bolt (1 pcs)

Part Name

Indication

Parts List

1

 

 

ABS

Plastic base (1 pcs)

 

 

Explanation

1. Put “1”(plastic base) on top of the ground 
plate. Make “3”(anchor bolt ) go through the 
hole of ground plate and “1”.
2. Attach “4”(cap washer) ,and next “5”( washer) 
on the screw. 
3. Put both nuts on the bolt. then close “2” 
(plastic cap).
4. Put “8”(level shim) under the ground plate to 
level the equipment whenever the ground is not 
level. The required quantity depends on the 
actual situation.
 
 

4

 

5

 

6 / 7

 

Galvanized steel

Galvanized steel

Galvanized steel

Cap washer (1 pcs)

Screw washer (1 pcs)

Nut (2pcs)

8

 

Galvanized steel

Level shim (flexible)

Summary of Contents for Proludic R37-UBX-208B

Page 1: ...NOTICES DE MONTAGE ASSEMBLY GUIDELINES...

Page 2: ...T I O N S 2 3 acier Inox Materiau Vis 2 Plaque signal tique 3 Pi ce Indication Liste pi ce 1 ABS support signal tique 1 1 3 Montage Fixer le support de signal tique en ABS 1 sur le poteau avec les vi...

Page 3: ...0 1 8 9 10 11 12 UBX 400 16 UBX 400 17 UBX 400 18 UBX 400 19 UBX 400 20 UBX 400 21 UBX 400 22 UBX 400 23 UBX 400 24 UBX 400 25 UBX 400 32 2 3 4 8 7 6 5 9 10 11 12 Axe sup rieur Petit axe V rin V rin V...

Page 4: ...kickbox Vis tremp e 13 13 14 15 14 15 16 19 18 17 16 17 18 19 UBX 400 33 UBX 400 34 UBX 400 35 UBX 400 36 UBX 400 37 UBX 400 38 UBX 400 39 Vis sup rieure kickbox Platine sup rieure kickbox Platine in...

Page 5: ...e fixation Passer la cheville 3 au travers de la platine et de l embase 1 2 Positionner lesrondelles 4 et 5 sur l extr mit de la cheville 3 Serrer les 2 crous sur la vis et mettre le bouchon plastique...

Page 6: ...elle caoutchouc 1 p 0RGH RSpUDWRLUH 1 Positionner la but e caoutchouc 3 sur la tige du v rin Mettre la rondelle 1 sur la but e 2 Positionner le support 2 puis dessus le couvercle 4 et verrouiller l en...

Page 7: ...e loctite 3 Emp cher l acc s jusqu s chage complet du b ton Standard Safety Area Vue de d tail O U T D O O R F I T N E S S S O L U T I O N S Volume b t on 365 Litres Masse de b ton 875 KG Sol de s cur...

Page 8: ...eel Q235 Rubber 1 3 2 1 2 2 Protection bras UBX 400 13 PU Polyurethane 2 Assise rectangulaire35 17 Assise ovale 35 17 Patented Design ZL 2012 3 0257946 8 12 37 RR6006 M10 20 M10 20 Flat M8 Round M6 8...

Page 9: ...niveau de vandalisme la situation en bord de mer ou non la pollution de l air l ge de l appareil Si le contr le d tecte un risque sur des pi ces qui ne peuvent tre r par es ou chang es imm diatement...

Page 10: ...tretien r gulier Fr quence mensuelle Il s agit principalement d inspection du fonctionnement r aliser selon un planning pr tabli une fois par mois Op ration OK Non Probleme Solution Rayures ou chocs s...

Page 11: ...__ Maintenance occasionnelle Il s agit de t ches visant valider l int grit physique de l appareil ex cuter selon un planning pr tabli au moins une fois par an par du personnel qualifi et exp riment Ri...

Page 12: ...ts en acier inoxydable ou la corrosion d acier mis nu serait acc l r e Toute rupture du traitement de surface doit tre trait e dans les 28 jours Si le m tal est nu poncer avec un papier abrasif grain...

Page 13: ......

Page 14: ...3 Steel Stainless steel Material Screw 2 Instruction sign 3 Part Name Indication Parts List 1 ABS ABS sign housing 1 1 3 Explanation Fix the ABS sign housing 1 on the main post with M8x20 flat screws...

Page 15: ...10 11 12 UBX 400 16 UBX 400 17 UBX 400 18 UBX 400 19 UBX 400 20 UBX 400 21 UBX 400 22 UBX 400 23 UBX 400 24 UBX 400 25 UBX 400 32 2 3 4 8 7 6 5 9 10 11 12 Top Axis Small Axis Piston Piston Piston Pist...

Page 16: ...ox Small Plate Tempered Screw 13 13 14 15 14 15 16 19 18 17 16 17 18 19 UBX 400 33 UBX 400 34 UBX 400 35 UBX 400 36 UBX 400 37 UBX 400 38 UBX 400 39 Kickbox Top Screw Kickbox Box Head Plate Kickbox Bo...

Page 17: ...nd plate Make 3 anchor bolt go through the hole of ground plate and 1 2 Attach 4 cap washer and next 5 washer on the screw 3 Put both nuts on the bolt then close 2 plastic cap 4 Put 8 level shim under...

Page 18: ...st 1 Stainless Rubber washer 1 pcs Explanation 1 Attach 3 rubber on the pull rod of piston Put 1 washer on top of the rubber 2 Attach 2 housing then put on 4 housing cap use 7 screw to lock the housin...

Page 19: ...attached using LocTite 3 Prevent access until concrete completely dry Standard Safety Area Detailed View O U T D O O R F I T N E S S S O L U T I O N S Concrete Volume 365 Liters Concrete Weight 875 K...

Page 20: ...UBX 400 5 UBX 400 4 UBX 400 1 UBX 400 7 UBX 400 6 Steel Q235 PU Polyurethane PU Polyurethane Aluminium Steel Q235 Rubber 1 3 2 1 2 2 PU Protector UBX 400 13 2 Rectangle Seat 35 17 Oval Seat 35 17 PU...

Page 21: ...se levels of vandalism coastal location air pollution age of equipment If parts are discovered to be unsafe during inspection and cannot be replaced or corrected immediately the equipment or parts sho...

Page 22: ...th Many routine maintenance tasks to inspect usage and function and need to be performed on a regularly scheduled basis of once a month General inspection Pass Fail Problem Solution Scratches or paint...

Page 23: ...y routine maintenance tasks to inspect gym s structural integrity and need to be performed on a regularly scheduled basis at least once a year by experienced trained personnel General Hazards Pass Fai...

Page 24: ...hould be paid to the areas adjacent to stainless steel components where corrosion on bare steel would be accelerated Any breaks in coating surface identified should be made good within 28 days Any bar...

Reviews: