Step
01
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ust
ai
n
C
oo
p
V2
M
ay
3
0,
2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
Lo
w
er
B
ack
Asse
m
bl
y
E6 T25 Bit
E1 Brown Screw
Fig 1
Fig 1a
1.1 Build 3 Back Units - Fig 1
Using
E6
T25 Bit in
E4
Bit Holder in your drill, drive 3
E1 Brown Screws
into pre-drilled holes as indicated by Green Arrows attaching
A19 Egg Box
Frames
(all three are the same)
on top of
A18 Back Lower Wind Panels
(also all the same) making sure all edges are flush. Repeat for other two sets too.
Note:
Only drive screws deep enough to hold and try not to bury heads too deeply into the wood.
1.2 Attach The 3 Units Together To Form Lower Back Assembly:
In a large flat area, attach the three units built in
Fig 1
into the Lower Back Assembly as indicated in
Fig 1A
using
E1 Brown Screws into Pre-Drilled Holes as indicated by arrows. Repeat until you have the entire 3 Unit Assembly. All of the pieces are the same. Set aside assembly when complete.
:-) Here we go !
A19
A18
E4 Bit Holder
A19
A19
A19
A18
A18
A18
Screws In All Pre-Drilled Holes
These screws will be a little at an
angle but that is okay.
Look For All Pre-Drilled Holes
= Direction Of Screws In Pre-Drilled Holes
Note:
Water accumulating in screw holes can causes premature rot
so we in some instances pre-drill from the bottom side going up.