![Upright SB47JRT Operator'S Manual Download Page 54](http://html.mh-extra.com/html/upright/sb47jrt/sb47jrt_operators-manual_1061284054.webp)
Chapter 9 – Stowing and Transporting
48
SB47JRT – 0075522
7. Use the hoist or crane to carefully raise and position
the aerial platform onto the transport vehicle.
Securing for Transport
Use the following procedure to secure the aerial platform
on the transport vehicle.
1. Chock the wheels.
2. Raise the main boom about 0.3 m (1
′
).
3. Place a wood block under the jib foot. Lower the plat-
form so the foot rests on the wood block.
4. Remove all personnel, tools, materials, or other loose
objects from the platform.
5. Turn the start switch off and place the platform con-
trol box cover over the upper controls if the machine
is equipped with that option.
6. Push the lower controls emergency stop button in-
ward. Turn the control selector switch off and remove
the key.
7. Turn the battery disconnect switch off.
8. Close and latch the cowling doors.
9. Use wire-ties to fasten the platform gate to the guard-
rails to prevent the gate from bouncing. Also, use
wire-ties to fasten the platform foot switch to the plat-
form floor.
10. Use a nylon strap to securely fasten the platform
against the wood block. Thread the strap over the
toeboard as shown in Figure 9.6.
Figure 9.6 – Platform
A
Caution
Ratchets, winches, and come-alongs can produce
enough force to damage machine components. Do
not over tighten the straps or chains when securing
the aerial platform to the transport vehicle.
11. Use chains or straps to securely fasten the aerial
platform to the transport vehicle using the tie-down
lugs as attachment points. Proper tie-down and haul-
ing are the responsibility of the carrier.
Summary of Contents for SB47JRT
Page 1: ...SB47JRT Operator Manual Jan 08 PN 508361 000 SB47JRT ...
Page 2: ......
Page 6: ......
Page 13: ...Chapter 2 Specifications SB47JRT 0075522 7 Engine Oil Viscosity Cummins B3 3 Deutz F3L 2011F ...
Page 14: ...Chapter 2 Specifications 8 SB47JRT 0075522 ...
Page 30: ...Chapter 6 Controls 24 SB47JRT 0075522 ...
Page 44: ...Chapter 7 Prestart Inspection 38 SB47JRT 0075522 ...
Page 50: ...Chapter 8 Operation 44 SB47JRT 0075522 Figure 8 6 Platform Work Lights ...
Page 58: ...Chapter 10 Emergency Operation 52 SB47JRT 0075522 ...
Page 64: ...Chapter 11 Troubleshooting 58 SB47JRT 0075522 ...
Page 66: ...Appendix A Glossary SB47JRT 0075522 ...
Page 67: ......